| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Tompkins Residence 1/5/21 4pm Single Family Home. Full build from ground up. All trades needed. | 01/05/2021 | ||
| Construction CSEP 2019 Pump Station 1/12/21 2pm The project consists of improvements to four (4) sanitary sewer pump stations identified as the Airp... | 12/09/2020 | 01/12/2021 | |
| Repairs to Farm Advisor Building 12/18/20 5pm • Repairs to the masonry block; • removal and replacement of the damaged gutter; • removal and repla... | 12/18/2020 | ||
| OR126 Williamette River Bridge Repair 12/8/20 10am Strengthening of steel truss members. | 12/08/2020 | ||
| Klamath Falls Confluence Project 12/11/20 5pm This project is a full block development with on-site parking and two separate new construction buil... | 12/11/2020 | ||
| WWTP Paving Project 12/17/20 2pm The work includes the furnishing of the labor, materials, and equipment for the construction of vall... | 12/17/2020 | ||
| Biosolids Land Application 1/19/21 2pm Project includes the pumping, mixing, hauling and application of biosolids from the Sisters Wastewat... | 01/19/2021 | ||
| Engineering Eagle Pt. HS Seismic Rehab 12/29/20 2pm Eagle Point School District 9 (the “District”) is seeking proposals from firms for the architectural... | 12/29/2020 | ||
| Ped Safety & Landscape Coburg & MLK 12/9/20 5pm Work includes providing pedestrian safety improvements such as sidewalk striping and fabrication and... | 12/09/2020 | ||
| Deschutes County Courthouse Remodel 12/10/20 2pm The work consists of demolition of existing cabinetry, low walls, raised flooring and skylights. Con... | 12/10/2020 | ||
| Title | Site Walk Through | Deadline |