| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| 17th, 18th Street Culvert Replace 12/9/20 2pm This project consists of two schedules entailing the removal and replacement of 2 culverts for a tot... | 12/09/2020 | ||
| Fisheries Building Construction 12/30/20 4pm The Karuk Tribe requests proposals for the following Scope of Work (SOW) required for the demolition... | 12/30/2020 | ||
| Pump Station #1 Flow Meter Installation 12/8/20 2pm The Project entails four new flow meters to be installed at Pump Station No. 1. Work includes reloca... | 12/01/2020 | 12/08/2020 | |
| A & E Health Professions Building 12/8/20 2pm Lane Community College of Eugene, Oregon, is seeking proposals from Oregon Registered Architects/Eng... | 12/08/2020 | ||
| Joint Utility Trench Trinity Co. 12/8/20 4pm Install a joint utility trench including an 8” water line, and multiple utility conduits, plus assoc... | 12/08/2020 | ||
| Repair & Recover Insulation PP Whse 12/10/20 2pm Repair and recover existing ceiling insulation for the Redding Power Plant Warehouse. | 11/25/2020 | 12/10/2020 | |
| OR42 Long Tom Creek Culvert 12/10/20 9am Grading, Drainage, Structure & Paving | 12/10/2020 | ||
| Cow Creek North Clinic Phase 1 12/3/20 2pm The project will be a multi-phased medical building, Phase 1 is approximately 7,600 SQ FT that consi... | 12/03/2020 | ||
| Marcola SD CTE Facility 12/2/20 2pm Work consists of all architectural, structural, and civil work for construction of the approximately... | 12/02/2020 | ||
| 2021 Wastewater Collection 12/8/20 2pm Work consists of: Cleaning of Pipes, Mainline Video Inspection, Install cured-in-place lining, Inter... | 12/08/2020 | ||
| Title | Site Walk Through | Deadline |