| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Fred Meyer Brookings 1/28/21 10am Including, but not limited to: restripe parking lot, demolition, concrete patching (refer to plumbin... | 01/28/2021 | ||
| Del Norte USD HVAC 1/28/21 2pm DEMOLITION AND REPLACEMENT OF (E) HVAC UNITS AT THE FOLLOWING SCHOOL SITES : 1. BESS MAXWELL ELEMENT... | 01/15/2021 | 01/28/2021 | |
| Beaver Hill Pit Roof Structure 2/18/21 2pm Work on this Project shall consist of the construction of an approximately 20,730 square foot pre-en... | 01/25/2021 | 02/18/2021 | |
| SW Sewer Basin Phases 1 & 2 Extension 2/9/21 2pm The Scope of Work includes, but is not limited to, trenching and installation of gravity sewer pipel... | 02/09/2021 | ||
| Bulk Water Station Addition 1/26/21 10am The work under this project includes all materials, labor, and equipment necessary for grading, unde... | 01/26/2021 | ||
| RFQ Airport Environmental Assessment 1-28-21 1pm The Josephine County Airports is seeking proposals from qualified firms to provide environmental eva... | 01/28/2021 | ||
| Seismic Evaluation of Existing Buildings 2/4/21 2pm Springfield Utility Board (SUB) will contract with one consulting firm to provide structural analysi... | 01/28/2021 | ||
| DDS Office Building 2/11/21 2pm The Project consists of the general construction services for the new office building, located at 25... | 02/11/2021 | ||
| Martha Anne Dow Center 1/26/21 1pm The purpose of this RFQ is to hire a professional engineering design firm for the renovation of appr... | 01/26/2021 | ||
| OR140 Brett Way Extension 2/4/21 9am Grading, drainage, structures, paving, signing, illumination, and roadside development. | 02/04/2021 | ||
| Title | Site Walk Through | Deadline |