| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Humboldt Co. Jail ADA Improvements 10/6/20 2pm Work will consist of improvements to the second, third, and fifth floors to achieve compliance with ... | 09/29/2020 | 10/06/2020 | |
| Cooling Tower Repairs 10/21/20 3pm Address and repair parts of the cooling tower. Replace the existing fire protection system with a ne... | 09/29/2020 | 10/21/2020 | |
| Install Sliding Glass Doors City Hall 10/7/20 2pm The Contractor shall, at his own expense, furnish all labor, materials, tools, transportation, equip... | 09/23/2020 | 10/07/2020 | |
| Cher-Ae-Heights Casino Hotel 10/9/20 5pm A new 77,100 square foot 100 room Hyatt Place Hotel | 10/09/2020 | ||
| Merlin Landfill Water Quality Swale 10/1/20 3pm Project includes: traffic control, erosion & sediment control, construction staking, demolition,... | 09/24/2020 | 10/01/2020 | |
| RHMA-G HMA & Concrete Barrier 10/22/20 2pm In Humboldt County In And Near Eureka From 0.8 Mile South Of Tompkins Hill Road Overhead To 0.4 Mile... | 10/22/2020 | ||
| Klamath Boat Marina to Lakeshore 10/8/20 2pm This project is to widen a six mile stretch of roadway along OR 140 to accommodate current and futur... | 10/08/2020 | ||
| Street Striping Project 9/29/20 2pm Repainting approximately: Approx. 171,500 total lf of yellow center line (Includes 4″ single y... | 09/29/2020 | ||
| Flooring at City Hall Common Areas 10/1/20 3pm Contractor shall furnish equipment, material, and labor for the installation of commercial grade Man... | 10/01/2020 | ||
| Churchill High School Wood Shop Remodel 9/22/20 2pm Renovation of an existing large classroom into a Wood Shop. The Project will be a single design and ... | 09/22/2020 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.