| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Technology Services Office Remodel 9/24/20 2pm The Project consists of the general construction services for the remodel of approximately 14,900 sq... | 09/10/2020 | 09/24/2020 | |
| Klamath Crimson Rose Classroom 9/30/20 2pm This project consists of building out and existing unfinished space inside the Klamath County Juveni... | 09/11/2020 | 09/30/2020 | |
| Erickson Dental Remodel & Addition 9/18/20 2pm 2,355 sf remodel and 908 sf expansion of an existing single story, wood framed dental clinic. Scopes... | 09/18/2020 | ||
| CM/GC Madison School Renovation 9/21/20 2pm The project includes building an addition to the existing building, replacement of existing modular ... | 09/02/2020 | 09/21/2020 | |
| Reservoir Cleaning & Inspection 9/22/20 3pm This project includes cleaning, cleaning waste discharge, and inspection at twelve (12) of the City&... | 09/22/2020 | ||
| Key and Core Replacement 9/7/20 3:00pm Design, purchase and installation of cores and keys to provide a secured and tracked key system for ... | 09/07/2020 | ||
| OIT Athletics AV System Equipment 8/31/20 1pm Procure audio and visual equipment for the Oregon Tech Athletics Building at the Oregon Tech Klamath... | 08/31/2020 | ||
| US 101 Johnson Ave. Intersection 9/10/20 9am The Work to be done under this Contract consists of the following: Install temporary traffic contro... | 09/10/2020 | ||
| Elk Ranch Roadway 9/8/20 4pm In general, the work includes the furnishing of the labor, materials, and equipment for the construc... | 09/01/2020 | ||
| Ashland Middle School Project 9/24/20 2pm Demolition, Concrete, Masonry, Structural Steel Framing, Steel Decking, Metal Fabrications, Aluminum... | 08/27/2020 | 09/24/2020 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.