| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Prineville Rails to Trails Project 10/8/20 9am Work includes grading, paving, curb ramps, signing and signal. | 10/08/2020 | ||
| CM/GC Community Hall Slope 10/8/20 2pm OSU is seeking proposals from qualified CM/GC firms to provide pre-construction services, constructa... | 09/24/2020 | 10/08/2020 | |
| Architectural Design Boivin Hall 10/13/20 1pm The Oregon Institute of Technology (“Oregon Tech”) is seeking proposals to select a contractor to pr... | 10/13/2020 | ||
| Phoenix High School BP3 Project 10/15/20 2pm Final Cleaning, Selective Demolition, Strengthening of Cast-In-Place Concrete, Concrete Floor Polish... | 09/25/2020 | 10/15/2020 | |
| Umpqua Dunes Staging Area Expansion 10/7/20 2pm Slurry seal existing trailhead, pave existing gravel parking, and expand trailhead to a paved standa... | 09/25/2020 | 10/07/2020 | |
| OR42 Cedar Point Rd Finley Lp 10/15/20 9am Project includes roadway construction, paving, curb ramps, erosion control, drainage, traffic contro... | - | ||
| OR126 Florence Eugene Shoulder Widen 10/8/20 9am Project includes roadway construction, traffic control, erosion control, signs, and pavement marking... | 10/08/2020 | ||
| OR234 Gold Hill Sams Valley Intersection Project 10/8/20 9am Project includes roadway construction, traffic control, erosion control, signs, signals, illuminatio... | 10/08/2020 | ||
| Northbound Port of Entry Paving Project 10/7/20 2pm The purpose of this ITB is to establish a Contract for furnishing materials, equipment, labor, and p... | 10/07/2020 | ||
| Newmark Bank Stabilization 10/6/20 2pm Excavate west end of Newmark Ave., install riprap, and install 60 feet of cured-in-place pipe lining... | 09/24/2020 | 10/06/2020 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.