Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Corvallis HS Supply Metal Building Systems 10/15/20 2pm
Supply of the Metal Building Systems |
10/15/2020 | ||
|
Solid Waste Welding Building Drainage 10/15/20 3pm
Replace asphalt concrete around the southwest corner of the Welding Building with concrete and as... |
10/15/2020 | ||
|
Annual Campus Roof Repair & Replace 10/27/20 2pm
Oregon State University (“OSU” and/or “Owner”) is conducting a competitive ONE OR TWOSTEP... |
10/12/2020 | 10/27/2020 | |
|
Asphalt Pavement Repairs 10/20/20 2pm
Asphalt Pavement Repairs on eight street sections with approximately 7,000 Square Yards of Asphal... |
10/20/2020 | ||
|
Cleveland & Emerald Watermain Replace 10/29/20 2pm
Construction of 8 inch potable waterline, construction of potable water services and fire hydrant... |
10/13/2020 | 10/29/2020 | |
|
Glenwood Substation Earthwork & Foundations 10/27/20 2pm
Prepare a plot of land for the construction of an electrical substation. The site prep work you a... |
10/13/2020 | 10/27/2020 | |
|
Goodpasture Bridge Roof Replacement 10/16/20 1pm
1. Work closely and collaboratively with Lane County engineering staff to develop plans that | 10/16/2020 | ||
|
Utility Water System Master Planning 10/26/20 3pm
Coos Bay-North Bend Water Board (Water Board) is requesting qualifications for Professional Eng... |
10/26/2020 | ||
|
Avion Water Office Building 10/14/20 2pm
New construction of a 6,702 square foot office building located at the NW corner of China Hat Roa... |
10/07/2020 | 10/14/2020 | |
|
Victorie Way & Grange St. Storm Drain 10/17/20 3pm
The project includes replacement of approximately 200 linear feet of 24” reinforced concrete pi... |
10/17/2020 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.