Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Half Moon Bay Shop 11/4/20 2pm
Construction of a shop and road, sewer work, electric work, and earthwork |
10/13/2020 | 11/04/2020 | |
|
Springhill Suites Marriott 10/28/20 2pm
Ground up wood framed 4 story hotel that is 79,712 SF in Navigators Landing. 149 room hotel on 2.... |
10/28/2020 | ||
|
GP Waterline Crossing I-5 10/22/20 3pm
Installation of approximately 3,140 Lineal Feet of 12″ Ductile Iron Water Main Pipe of whic... |
10/15/2020 | 10/22/2020 | |
|
Reinhart Park Pergola Repairs 10/29/20 3pm
REPLACEMENT OF ALL PERGOLA WOOD COMPONENTS WITH DECAY RESISTANT WOOD AND PRIME/PAINT NEW WOOD TO ... |
10/15/2020 | 10/22/2020 | |
|
Jewett Elementary New Building 10/22/20 2pm
Construction of a new 11,442 sf gymnasium and makerspace building. Main structure consists of two... |
10/22/2020 | ||
|
Remove & Replace Asphalt WWTP 10/19/20 12pm
Grind and remove existing asphalt, place new asphalt, and raise valve boxes and lids to grade at ... |
10/19/2020 | ||
|
Corvallis HS Supply Metal Building Systems 10/15/20 2pm
Supply of the Metal Building Systems |
10/15/2020 | ||
|
Solid Waste Welding Building Drainage 10/15/20 3pm
Replace asphalt concrete around the southwest corner of the Welding Building with concrete and as... |
10/15/2020 | ||
|
Annual Campus Roof Repair & Replace 10/27/20 2pm
Oregon State University (“OSU” and/or “Owner”) is conducting a competitive ONE OR TWOSTEP... |
10/12/2020 | 10/27/2020 | |
|
Asphalt Pavement Repairs 10/20/20 2pm
Asphalt Pavement Repairs on eight street sections with approximately 7,000 Square Yards of Asphal... |
10/20/2020 | ||
| Title | Site Walk Through | Deadline |