| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Klamath Co. Courthouse Office Remodel 6/15/21 2pm • Remove an existing high-density filing storage system (center section of rolling file shelves) and... | 05/18/2021 | 06/15/2021 | |
| Storm Rehab Brooklyn Ave 6/3/21 2pm Storm line rehabilitation of approximately 365 lineal feet of 48 inch diameter and 515 lineal feet o... | 06/03/2021 | ||
| Propane Generator Install 5/21/21 5pm Remove existing propane generator and install new 45KW propane generator at the Headway Building loc... | 05/21/2021 | ||
| Manzanita Hills H2O Arsenic Treatment 6/9/21 2pm Replacing the current arsenic treatment system in the pump house located on Cindy Way. The proposed ... | 05/26/2021 | 06/09/2021 | |
| Trail Bridge Reservoir Program 6/1/21 2pm Two Bid Packages: Demo/Earthwork/Exterior Improvements/Utilities Concrete/Site furnishings | 05/18/2021 | 06/01/2021 | |
| HWY101 Inversion Lining Project 6/8/21 2pm a. Install inversion lining in approximately 940 lineal feet of existing 8-inch sewer lines at vario... | 06/08/2021 | ||
| I & I Removal Project 6/8/21 3pm a. Install inversion lining in approximately 3,820 lineal feet of existing 8-inch to 10-inch sewer l... | 06/08/2021 | ||
| Furnish & Install Generator Ruch 6/24/21 2pm Install a Diesel Generator at Ruch Outdoor School. | 06/07/2021 | 06/24/2021 | |
| Mehta Apartments 5/28/21 5pm Ground up construction of a new 20-unit apartment complex. 12,888sf, two story wood framed structure... | 05/28/2021 | ||
| Front Street Building Demo 6/10/21 2pm The building at 891 Front Street will be demolished, all material to be removed to a minimum of 1 fo... | 05/19/2021 | 06/10/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.