| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Walker & Swartz Creek Culverts 8/24/21 2pm Project consists of replacing an existing corrugated metal pipe (CMP) culvert (11’ width x 7’ rise x... | 08/24/2021 | ||
| Design, Fab, Deliver 3 Bridges 8/11/21 3pm Three replacement bridge substructures, pre-engineered and prefabricated, all structural systems sha... | 08/11/2021 | ||
| E Main St Stevens Rd Parking Lot 8/10/21 10am The project consists of removal and repaving of the Church on the Hill parking lot at 400 Stevens Ro... | 08/10/2021 | ||
| Project Management 3 Rivers School District 8/25/21 2pm The Three Rivers / Josephine County Unit Joint School District invites qualified individuals or firm... | 08/25/2021 | ||
| Itroop Guardrail Replacement 8/23/21 5pm Removal and disposal of existing guardrail and posts, installation of new steel guardrail and posts ... | 08/03/2021 | 08/23/2021 | |
| Coos Bay North Jetty Repair 9/1/21 11am Proposed Coos Bay North Jetty mandatory work includes toe, side slope, and crest repair construction... | 09/01/2021 | ||
| COCC Boyle Chiller 8/26/21 4pm Remove and replace Boyle Education Center chilled water system. | 08/04/2021 | 08/26/2021 | |
| Thermal Storage Tank Design Build 8/18/21 2pm Design and construction of a Thermal Storage Tank (TES tank). Detailed scope of the work includes a... | 08/18/2021 | ||
| COCC Building 3 Boilers 8/26/21 4pm Removing existing Building 3 boilers and replacing said system. | 08/26/2021 | ||
| Mountain Avenue Overlay 9/2/21 2pm The City of Ashland is seeking a professional engineering consultant to provide plans, specificatio... | 09/02/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.