| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Tulelake Parking Lot Gravel 6/25/21 5pm Supply and Deliver 1,400 tons of ¾ inch minus commercial gravel to the Lower Klamath Maintenance Sho... | 06/25/2021 | ||
| South Gate Bridge Project 7/22/21 1pm Build and install a 28 foot long by 16 foot wide concrete bridge with precast, pre-stressed voided c... | 07/22/2021 | ||
| McDonald’s Klamath Falls 6/21/21 12pm Sitework, paving, seal coating, striping, landscape/irrigation, interior/exterior demolition, concre... | 06/21/2021 | ||
| Windsor Estates Speed Table 7/15/21 2pm Installation of four (4) HMA speed tables and associated striping and signage assemblies. All other ... | 07/15/2021 | ||
| Citywide Safety 3rd & Pinebrook 7/15/21 2pm Construction of accessible curb ramps, sidewalk, modular block wall, a raised concrete median safety... | 07/15/2021 | ||
| SE Anton Center 6/25/21 4pm Sub bids needed for excavation, slab prep, unterground utilities, stormwater detention system, site ... | 06/25/2021 | ||
| Burrill’s 7th St. Station 7/6/21 2pm Main structures consist of two pre-engineered metal buildings each 10,000 GSF of office, warehouse w... | 07/06/2021 | ||
| 2021 Main St. Stevens Road Driveways 6/16/21 10am Traffic control, concrete driveway, concrete removal, minor grading. | 06/16/2021 | ||
| Warehouse Add & Office Renovations 8/17/21 2pm The scope consists of site demolition, office space renovation, demolition of an existing warehouse ... | 06/15/2021 | 08/17/2021 | |
| Fence Removal & Replace 6/25/21 5pm Removal & disposal of wire fencing. Removal of vehicle access gate. Removal & disposal of tw... | 06/25/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.