| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| S 6th St. Viaduct Improvement 9/9/21 4pm The City is seeking a qualified consultant or consultants to design improvements to the South 6th St... | 09/09/2021 | ||
| Fred Meyer Springfield 8/26/21 10am Interior remodel of an existing Fred Meyer Grocery Store in Springfield, OR. | 08/26/2021 | ||
| Weed USD DSA Project Inspector 9/8/21 3pm Weed Union Elementary School District (“District”) is requesting proposals for an on-site DSA Projec... | 09/08/2021 | ||
| Historic Bowerman Roof Replacement 9/7/211pm The purpose of this project is to improve the roofing condition at Bowerman Barn. This will include ... | 09/07/2021 | ||
| Garden Grove Apartments 9/30/21 3pm This is a remodel of the site, exterior, and interior of an existing 60 unit apartment complex with ... | 08/24/2021 | 09/30/2021 | |
| Court St. Storm Drain Replace 8/31/21 3pm Replace approximately 120 linear feet of corrugated metal pipe arch with 36-inch reinforced concrete... | 08/31/2021 | ||
| U of O Knight Campus 4th Floor Surgery 8/31/21 2pm The Project consists of the construction of Renovation to existing 4th floor West wing laboratory su... | 08/18/2021 | 08/31/2021 | |
| Big Sky Park Improvements 9/16/21 2pm Project consists of construction of roadways, parking, pathways & plaza spaces, installation of ... | 09/16/2021 | ||
| Re-Roofing Crater Lake National Park 8/24/21 2pm The National Park Service, Crater Lake National Park, has a requirement for the re-roofing of buildi... | 08/24/2021 | ||
| Jacksonville Fire Station Seismic 2nd Story 9/9/21 2pm Demolition of the majority of the existing 3,321 square foot fire station, with only 3 exterior wall... | 09/09/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.