| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| North Bend HS Kitchen Upgrade 7/1/21 1pm Contract consists of the removal and replacement of the existing walk-in cooler/freezer and demo of ... | 07/01/2021 | ||
| Paving of Old 99 Hwy South 7/14/21 8:30am Implement temporary traffic control, perform cold-plane pavement removal, construct asphalt concrete... | 07/14/2021 | ||
| Chadwick Lane Crosswalk 7/14/21 8:30am Remove and reconstruct ADA ramps, sidewalks, curb and gutter. Install rectangular rapid flashing bea... | 07/14/2021 | ||
| Iverson Crossing Culvert 7/22/21 3:30pm Excavation and embankment Construct and maintain diversion during construction Construction of 17’ x... | 07/22/2021 | ||
| 2021 Crack Seal 6/28/21 2:30pm Traffic control, crack seal | 06/28/2021 | ||
| McNabb Creek Helipond Repair 7/14/21 3:30pm Ditch Excavation Construct diversion during construction Construction of new flashboard riser ... | 07/14/2021 | ||
| Powers Ranger Station HVAC 7/2/21 4pm Provide all equipment, labor, materials, supplies and supervision to supply and install up to four n... | 07/02/2021 | ||
| Locust St. Sewer Relocate 7/15/21 2pm Re-location and construction of a 12-inch sanitary sewer pressure main crossing Whychus Creek, creek... | 07/15/2021 | ||
| Northpointe Park 7/15/21 2pm Construction of a new neighborhood Park, including right of way work, & all work required per pr... | 07/15/2021 | ||
| Backup Generators Oregon Caves 7/7/21 5pm Construction of three standby generators at mission critical buildings, including gas connections, t... | 07/07/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.