| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Solid Waste Beaver Hill Fence Project 10/5/21 2pm Install new 7-foot chain link fence including all hardware, post, rails, and braces with new three s... | 09/16/2021 | 10/05/2021 | |
| 7th & Minnesota Road Rehab 9/28/21 2pm South 7th Street Road Rehabilitation – Work includes new asphalt concrete pavement, aggregate ... | 09/28/2021 | ||
| KTHA Stove Cleaning 9/24/21 5pm All necessary materials, labor, equipment, permits, and fees needed to annually clean and inspect wo... | 09/24/2021 | ||
| Yreka Security Fence Upgrades 9/21/21 1pm Repair/Replace chain link fence, razor wire, barbed wire, barbed wire arms, structure weight posts w... | 09/21/2021 | ||
| EWEB 3 Phase Substation Regulators 10/7/21 2pm Two 1500/2000 KVA 3φ step voltage regulators that are to be matched with 12/16/20 MVA 115-1... | 10/07/2021 | ||
| 2021 Paving Eagle Point 9/21/21 2:30pm This project consists of furnishing all labor, equipment, and materials necessary for paving the str... | 09/21/2021 | ||
| Table Rock Motel Phase 2 9/28/21 5pm Replace & add units to the existing Table Rock Motel and other improvements. The buildings consi... | 09/28/2021 | ||
| Landfill Leachette Pre-Treatment Plant 11/9/21 2pm The construction of a new Leachate Pre-Treatment Plant at the Roseburg Landfill, including the suppl... | 11/09/2021 | ||
| Architectural Design New Residence Hall 10/12/21 1pm Architectural and engineering design and construction administration services are required through t... | 09/23/2021 | 10/12/2021 | |
| 3 Phase Pad Type Transformers 9/28/21 3pm It is the intent of these specifications to obtain, for the City of Redding Electric Utility, transf... | 09/28/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.