| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Madrona #2 Sewer & Pavement 7/20/21 2pm Removal and preparation of street, prepare and pave back 750 tons of Level 2 HMAC, replacement of 59... | 07/09/2021 | 07/20/2021 | |
| Gym Facility Remodel 8/6/21 4pm 5,824 square foot project converting the Karuk “Old Gym” into a community center, kitche... | 07/07/2021 | 08/06/2021 | |
| South Umpqua HS Covered Walkway 7/8/21 2pm Work on this project consists of the remodel and enclosure of an existing covered walkway on the sou... | 06/24/2021 | 07/08/2021 | |
| Foundation & Drainage Winston Middle School 7/8/21 2pm The Winston Dillard School District requests sealed Bids from qualified Bidders for the Foundation R... | 06/24/2021 | 07/08/2021 | |
| Alderpoint Rd. MP40 Storm Damage 7/27/21 2pm The work to be done consists of traffic control systems, reinforced roadways, reconstructed embankme... | 07/27/2021 | ||
| CM/GC Health Professions Building 7/16/21 2pm The selected CM/GC firm will provide construction management and general contracting services, start... | 07/07/2021 | 07/16/2021 | |
| HVAC Powell Butte Charter School 7/7/21 1pm Select a Design-Build contractor to develop projects that will improve the indoor air quality and HV... | 07/07/2021 | ||
| Head Start Facility Renovation 6/28/21 5pm Remove and dispose of all flooring, cabinets, and kitchen island. Install approximately 300 square f... | 06/28/2021 | ||
| Airport Road Improvements 7/8/21 5pm Road improvements along the north side of Airport Rd. Includes but not limited to; excavation, rock ... | 07/08/2021 | ||
| Ashland Library Renovation 7/27/21 2pm Project includes demolition, new carpet, ceiling tiles, new storage room walls and door, case work, ... | 07/09/2021 | 07/27/2021 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.