| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Winchester Bay Crab Dock Repairs 7/27/21 2pm Repair damage to Winchester Bay Crab Dock caused by FEMA event. | 07/08/2021 | 07/27/2021 | |
| Normil Terrace Waterline Extension 7/12/21 2pm Construction of 8” waterline at Normil Terrace in Medford. This work consists of, but is not limited... | 07/12/2021 | ||
| Old CP Force Main Replace 7/13/21 2:15pm The construction of 1,116 feet of 8 inch and 1,373 feet of 10 inch sanitary sewer pipe along with as... | 07/13/2021 | ||
| Grove Phase 2 7/14/21 2pm Construction of a 34,176SF three story multi-family residential building. The building has tuck-unde... | 07/14/2021 | ||
| Sutherlin SD Residing 7/16/21 2pm Residing of East Primary School 9 1/4 plank w/ 8″ exposure installed Install or repair existin... | 07/16/2021 | ||
| A & E Medical Complex 7/14/21 5pm The property, selected by Tribal staff for this project, will need to be surveyed to determine triba... | 07/14/2021 | ||
| US101 Big Creek Bridge 7/22/21 9am 1. Construct Replica Historic Bridge Railing. 2. Temporary Traffic Control | 07/22/2021 | ||
| City of Bend Signal Upgrades 7/15/21 9am 1. Install traffic signal modifications at nine different locations within the city of Bend. 2. Inst... | 07/15/2021 | ||
| OR36 Indian Creek Bridge 7/15/21 9am 1. Install and remove temporary traffic control and erosion control measures. 2. Install and remove ... | 07/15/2021 | ||
| Fowlers Campground Tree Removal 7/20/21 10am The Shasta-McCloud Management Unit is requesting a logging company or tree service to remove 170 tre... | 07/20/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.