| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| US97/US20 Bend N Corridor Design Build 8/18/21 9am This re-evaluation assesses the effect of environmental statutes, regulations, policies and guidance... | 08/18/2021 | ||
| Stillwater Business Park Lighting 7/15/21 3pm Install seven street lights along the south side of Venture Parkway from Old Oregon Trail to Stillwa... | 07/15/2021 | ||
| Carr Fire Buenaventura Bridges 7/30/21 3pm Install nine pedestrian bridges along the Buenaventura Trail that were burned during the 2018 Reddin... | 07/30/2021 | ||
| Single Phase Distribution Transformers 7/19/21 3pm SINGLE-PHASE, PAD-TYPE DISTRIBUTION TRANSFORMERS 12kV-240/120V, Single Phase | 07/19/2021 | ||
| Big Butte Springs Watershed Logging 7/27/21 2pm Commercial thinning will be focused on an area approximately 180 acres in size, east of and immediat... | 07/27/2021 | ||
| Remove & Replace HVAC Lava Beds 7/28/21 2pm The National Park Service, Lava Beds National Monument, has the requirement for the removal of exist... | 07/28/2021 | ||
| Fairchild Medical Lobby Remodel 9/29/21 12pm Project consists of partial demolition of an existing administration space, lobby, partial corridoor... | 09/29/2021 | ||
| Campus Dr. Dan O’Brien Roundabout 8/3/21 1pm Construction of a roundabout at the intersection of Campus Drive and Dan O’Brien Way. Work includes ... | 07/01/2021 | 08/03/2021 | |
| RFQ Engineering Svcs. Wastewater System 8/5/21 4pm The City of Grants Pass desires to select an engineering firm to enter into a five-year Master Servi... | 07/14/2021 | 08/05/2021 | |
| Coos Co. Paving Project 7/20/21 2pm Mobilization and demobilization • Traffic Control • Install temporary flexible pavement markers as n... | 07/20/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.