Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Klamath Co. Museum Sidewalk Replace 3/2/21 2pm
Removal of existing sidewalk and construction of new sidewalk, raised concrete planters/benches a... |
02/16/2021 | 03/02/2021 | |
|
North Eugene HS Bid Set C 3/12/21 2pm
The scope of work includes all building components (less structural steel and CMU), including but... |
03/12/2021 | ||
|
7-11 Convenience Store 3/2/21 2pm
New ground up 7-11 Convenience store. ALL SCOPES OF WORK ARE BIDDING. Please note sheet A0.2 for ... |
03/02/2021 | ||
|
I5 MP85 Culvert Repair *Cancelled*
Culvert Repair located on Interstate 5 at MP 85.95, including the following: Work Zone Traffic Co... |
02/25/2021 | ||
|
Rice Creek Bridge Replacement 3/26/21 2pm
Rice Creek Bridge is located at Milepost 1.41 on Willis Creek Rd (County Road #43), near the city... |
03/26/2021 | ||
|
Replace Bridge Hinkle Creek 3/26/21 2pm
Hinkle Creek Bridge is located at Milepost 0.04 on Hinkle Creek Rd (County Road #281), near the c... |
03/26/2021 | ||
|
2021 Spring Street Projects 3/4/21 2pm
The Project is for roadbed reconstruction, asphalt overlay, and removal of old asphalt at various... |
02/16/2021 | 03/04/2021 | |
|
NATVET TI 3/10/21 4pm
Veterinarian tenant improvement project of 6,149gsf on the first floor of an existing two story r... |
03/10/2021 | ||
|
Bridge Replacement McCullough Creek 3/26/21 2pm
The project scope includes the design and construction of a new bridge to replace the existing br... |
03/26/2021 | ||
|
Liquid Roads Ultra Project 3/3/21 2pm
Consists of approximately 384,840 Sq Ft (42,760 Sq Yd) of surface treatment, with an engineer’s... |
03/03/2021 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.