Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
South County Paving 2021 6/2/21 2pm
Construct roadway improvements on the following Curry County roads: Chapman Lane, Crestline Loop,... |
06/02/2021 | ||
|
I-5 Brushing NB & SB MP14-30 5/20/21 2pm
Brush and remove vegetation along the Southbound and Northbound right-of-way of Interstate 5 betw... |
05/12/2021 | 05/20/2021 | |
|
Reduced Pressure & Gravity Zone Design 6/4/21 3pm
Provide engineering consultation on a multi-phase, multi-year project to assist in the design and... |
06/04/2021 | ||
|
Klamath Co. Courthouse Office Remodel 6/15/21 2pm
• Remove an existing high-density filing storage system (center section of rolling file shelves... |
05/18/2021 | 06/15/2021 | |
|
Storm Rehab Brooklyn Ave 6/3/21 2pm
Storm line rehabilitation of approximately 365 lineal feet of 48 inch diameter and 515 lineal fee... |
06/03/2021 | ||
|
Propane Generator Install 5/21/21 5pm
Remove existing propane generator and install new 45KW propane generator at the Headway Building ... |
05/21/2021 | ||
|
Manzanita Hills H2O Arsenic Treatment 6/9/21 2pm
Replacing the current arsenic treatment system in the pump house located on Cindy Way. The propos... |
05/26/2021 | 06/09/2021 | |
|
Trail Bridge Reservoir Program 6/1/21 2pm
Two Bid Packages: Demo/Earthwork/Exterior Improvements/Utilities Concrete/Site furn... |
05/18/2021 | 06/01/2021 | |
|
HWY101 Inversion Lining Project 6/8/21 2pm
a. Install inversion lining in approximately 940 lineal feet of existing 8-inch sewer lines at va... |
06/08/2021 | ||
|
I & I Removal Project 6/8/21 3pm
a. Install inversion lining in approximately 3,820 lineal feet of existing 8-inch to 10-inch sewe... |
06/08/2021 | ||
| Title | Site Walk Through | Deadline |