Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
Riverfront Watermain ext. Phase II 2/17/21 2pm
Extension of a 42″ water main located on the University of Oregon’s riverfront proper... |
02/17/2021 | ||
District 7 Sutherlin MIM Paving 2/16/21 3pm
Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified As... |
02/16/2021 | ||
Tree & Veg Clearing OR238 MP32-33 2/11/21 3pm
Furnish material, equipment, and labor to fall trees, trim tree canopy, remove vegetation, chip m... |
02/11/2021 | ||
Stormwater Facility & Taxiway Removal 3/2/21 2pm
Demolition of the existing Taxiway B3 and the constructionof two separate stormwater facilities: ... |
02/11/2021 | 03/02/2021 | |
Engineering & Environmental Pump House 1 2/26/21 3pm
Provide environmental consulting and professional design services for the Pump House #1 Generator... |
02/26/2021 | ||
20/30 Park Renovation 3/5/21 5pm
The Project scope and needs include the design of multi-use athletic courts including volleyball,... |
02/16/2021 | 03/05/2021 | |
Chinese Immersion Program Renovation 2/18/21 2pm
Renovation of classrooms in the existing Buildings C, E, F, and G at Kennedy Middle School to acc... |
02/09/2021 | 02/18/2021 | |
Seabreeze & Lake Ct. Storm Drain Replace 2/25/21 2pm
The Project entails two Schedules for removal and replacement of storm drain line, rehabilitation... |
02/16/2021 | 02/25/2021 | |
Sunset HS Fire Alarm Replace 3/31/21 1pm
Remove existing fire alarm system and replace with new automatic, voice annunciated fire alarm sy... |
03/17/2021 | 03/31/2021 | |
Margaret Keating Elem Fire Alarm Replace 3/8/21 1pm
Remove existing fire alarm system and replace with new automatic, voice annunciated fire alarm sy... |
02/18/2021 | 03/08/2021 | |
Title | Site Walk Through | Deadline |