| North Douglas Elem/HS Classroom Seismic 3/9/22 2pm The project scope includes seismic strengthening for the Elementary/Middle School main building and ... | 02/04/2022 | 03/09/2022 | |
| Diamond Lake Rescue Building 2/22/22 2pm Concrete foundation framing and foundation construction and erection of a 36×60 pre-fab metal b... | 02/03/2022 | 02/22/2022 | |
| BLM Green Mountain Lookout 2/15/22 11am Cleaning Interior and Exterior faces of CMU Block and sealing cracks in Mortar as needed to prepare ... | 02/15/2022 | ||
| Milam Hall Roof Replacement 2/21/22 2pm This project consists of re-roofing the entire building (28,000 sf), installing new fall protection,... | 02/02/2022 | 02/21/2022 | |
| Ponderosa Elem Ceiling Fan Add 2/8/22 3:30pm Installation of ceiling fans and controls | 01/26/2022 | 02/08/2022 | |
| Generator Install Yreka Clinic 2/21/22 5pm Install of a 300kW emergency generator to supply power for the Karuk Medical/Dental clinic located a... | 02/21/2022 | ||
| 115kv Air Switches for Currin Substation 2/10/22 2pm The new Currin Substation design requires 25 sets of 115kv air switches. | 02/10/2022 | ||
| City of Gold Beach 2021 WTP Improve 3/1/22 2pm a. Demolition and removal of existing raw water intake building, controls, valve vault, temporary pi... | 02/01/2022 | 03/01/2022 | |
| Quartz Neighborhood Park 2/23/22 2pm The project includes 6.4 acres of new park development including a parking lot, pedestrian paving, a... | 02/01/2022 | 02/23/2022 | |
| Walton MV Service & Switch Install 2/11/22 3pm Purchase and installation of two (2) pad mount medium voltage dielectric switches, provide MV cables... | 01/27/2022 | 02/11/2022 | |
| Title | Site Walk Through | Deadline |