| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Klamath Falls DHS 9/17/20 2pm A ground-up, 91,950 SF 3-story office building. This building consists of masonry and metal cladding... | 09/17/2020 | ||
| Thurston Rd Ph 6 Restoration 9/2/20 2pm A.Saw cut and remove additional asphalt, cold mix asphalt, CLSMat crossings, and/oraggregate materia... | 08/31/2020 | 09/02/2020 | |
| Pilot Butte Canal Staking Services 9/3/20 2:30pm Define the design survey base used the Engineer in layout of the pipe system, and to set forth the r... | 09/03/2020 | ||
| Pilot Butte Canal Group 1 Precast Concrete 9/3/20 2pm Precast Fittings. Specs noted in section V of ITB | 09/03/2020 | ||
| Technology Services Office Remodel 9/24/20 2pm The Project consists of the general construction services for the remodel of approximately 14,900 sq... | 09/10/2020 | 09/24/2020 | |
| Klamath Crimson Rose Classroom 9/30/20 2pm This project consists of building out and existing unfinished space inside the Klamath County Juveni... | 09/11/2020 | 09/30/2020 | |
| Erickson Dental Remodel & Addition 9/18/20 2pm 2,355 sf remodel and 908 sf expansion of an existing single story, wood framed dental clinic. Scopes... | 09/18/2020 | ||
| CM/GC Madison School Renovation 9/21/20 2pm The project includes building an addition to the existing building, replacement of existing modular ... | 09/02/2020 | 09/21/2020 | |
| Reservoir Cleaning & Inspection 9/22/20 3pm This project includes cleaning, cleaning waste discharge, and inspection at twelve (12) of the City&... | 09/22/2020 | ||
| Key and Core Replacement 9/7/20 3:00pm Design, purchase and installation of cores and keys to provide a secured and tracked key system for ... | 09/07/2020 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.