Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Building 127 Kingsley Field 9/23/21 11am
Building 127 addition proposes a Pre-Engineered Metal Building (PEMB) to |
09/23/2021 | ||
|
Chemical Injection Sprayer 10/14/21 2pm
Purchase of one (1) chemical injection sprayer. |
10/14/2021 | ||
|
Pithvuyram Center Remodel 9/27/21 4pm
THE EXISTING KARUK “OLD GYM”, WHICH IS 3,704 SQUARE FEET, |
09/27/2021 | ||
|
RCC Ceramics Building Redwood Campus 10/11/21 2pm
Renovation of an existing 1,792 sqft building that will be referenced as the Redwood Campus Ceram... |
09/28/2021 | 10/11/2021 | |
|
California Alley Utility Improve 10/14/21 3pm
Replace approximately 1,560 feet of sewer main within the California Street Alley and Yuba Street... |
10/14/2021 | ||
|
Design Build Winston Dillard SD Offices 11/4/21 2pm
The building must have twelve (12) offices as detailed: |
11/04/2021 | ||
|
Evergreen Family Medicine Office 10/7/21 4pm
Adroit Construction Company is seeking subcontractor bids for work including but |
10/07/2021 | ||
|
Peoples Irrigation Pipe Install 10/5/21 2pm
Mobilize, perform selective demolition, install a furnished approximate 1,893 LF of 48-inch diame... |
09/23/2021 | 10/05/2021 | |
|
Water Quality Improvements Project 10/19/21 2pm
Construct a new chemical storage and dosing building at the Robert A. Duff Water Treatment Plant ... |
10/19/2021 | ||
|
Solid Waste Beaver Hill Fence Project 10/5/21 2pm
Install new 7-foot chain link fence including all hardware, post, rails, and braces with new thre... |
09/16/2021 | 10/05/2021 | |
| Title | Site Walk Through | Deadline |