Filter
Title | Site Walk Through | Deadline | |
---|---|---|---|
OR126 Cline Falls Bridge Paving 4/13/21 2pm
Establish a Contract for removing the existing asphalt and membrane from the existing bridge deck... |
04/13/2021 | ||
Elmira-Veneta Multi-Use Paths 4/29/21 4pm
This project is to provide preliminary engineering and environmental studies needed to obtain | 04/29/2021 | ||
Water Storage Improvement Project 5/14/21 3pm
The Project contemplated consists of the following major components: |
04/14/2021 | 05/14/2021 | |
Duff WTP Relocated Entrance 4/20/21 2pm
This work consists of, but is not limited to: asphalt cutting and grinding, excavation and placem... |
04/06/2021 | 04/20/2021 | |
Fire Monitoring for Power Plant 4/20/21 2pm
The successful contractor will provide a bill of materials with part numbers, which the City of R... |
04/08/2021 | 04/20/2021 | |
Cross Street Water Main Replace 4/20/21 2pm
Water main installation on Cross Street between N. Garfield Street and the end of Foch Street in ... |
04/20/2021 | ||
Region 3 Geotechnical Drilling Rebid 5/12/21 3pm
The Oregon Department of Transportation is seeking one qualified Contractor to provide Geotechnic... |
04/13/2021 | ||
Thurston Hills Trail Phase II 4/26/21 2pm
The work consists of construction of approximately 4.21 miles of new multi-use trail. Of the 4.29... |
04/12/2021 | 04/26/2021 | |
Tumalo-Broadway Water Line Replace 4/28/21 2:00pm
The scope of the work includes, but is not limited to, trenching & installation of approximat... |
04/14/2021 | 04/28/2021 | |
Virginia, Colorado Stripe & Pave 4/14/21 2pm
Removal and replacement of 577 feet of 24” storm drain, prepare and pave 1529 tons of Level 2 H... |
04/06/2021 | 04/13/2021 | |
Title | Site Walk Through | Deadline |