| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Transpacific Pkwy Drainage Improve 6/8/22 2pm The Work consists of, but is not limited to; traffic control, asphalt saw-cutting, asphalt grinding,... | 05/17/2022 | 06/08/2022 | |
| Polk St. Water Main Replace 5/19/22 2pm The construction and installation of 4190 feet of 8-inch ductile iron water main in Polk Street from... | 05/19/2022 | ||
| Oakdale Middle School Furniture 5/25/22 2pm School and office furniture for our new middle school, currently under construction. The new school ... | 05/25/2022 | ||
| Paving Alfalfa Market to Johnson Ranch 5/18/22 2pm The Class of Work of this Project is Asphalt Concrete Paving and Oiling. The value for this Contract... | 05/18/2022 | ||
| Phoenix Civic Center Temp Facilities 5/12/22 2pm Includes the renovation of approximately 3,000 square feet of the existing Civic Building to create ... | 05/12/2022 | ||
| ADA Curb Ramp Improve Phase 2 5/24/22 2pm The work to be done consists of traffic control system, roadway excavation, hot mix asphalt for shar... | 05/24/2022 | ||
| Grider Creek Campground Repair 6/1/22 5pm The project consists of installing a 4-inch gravel cap comprised of aggregate surface course to 46N2... | 06/01/2022 | ||
| District 7 Curbing Repair 5/10/22 3pm ESB Project. Remove existing curbing and construct new concrete drainage curbing at various location... | 05/10/2022 | ||
| Skinner Butte Park Steps Repair 5/24/22 4pm Two concrete step repair projects at the top and bottom of an existing trail near the Skinner Butte ... | 05/09/2022 | 05/24/2022 | |
| Baker Park Parking Lot Reconstruction 5/12/22 3pm The project will consist of installing of approximately 5 lineal feet of 8″ sanitary sewer pip... | 05/05/2022 | 05/12/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.