| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Mountain View HS AV Project 6/9/22 2pm Supplying and installing approx. 50 classrooms with AV equipment. | 06/01/2022 | 06/09/2022 | |
| Terminal Spur Sanitary Sewer 7/5/22 2pm Construct approximately 2,570 feet of 24-inch sanitary sewer, with manholes, remove 2,095 feet of 18... | 06/01/2022 | 07/05/2022 | |
| Bay Area Hospital Storage Facility 6/6/22 5pm Construction of a pre-engineered metal building, approximately 50 foot by 80 foot, 4,000 square foot... | 06/06/2022 | ||
| Homefront Parking Lot 6/23/22 2pm Parking lot repairs and possible addition of ramps in accordance with the County’s Americans with Di... | 06/23/2022 | ||
| 3rd St. Geothermal Mainline Replace 6/9/22 2pm Asphalt pavement removal, trench excavation, removal and disposal (or salvage) of existing waterline... | 05/31/2022 | 06/09/2022 | |
| Valley Inn Restaurant Design Build 6/30/22 5pm The Hoopa Valley Tribe will be accepting Design-Build proposals from qualified Contractors for the r... | 06/30/2022 | ||
| Spiegelberg Stadium Lighting 6/15/22 2pm New LED lighting system and electrical upgrades at Spiegelberg Stadium. | 05/27/2022 | 06/15/2022 | |
| Wastewater Rehab Harlow Cleanouts 6/2/22 2pm Installation of cleanouts on existing wastewater service laterals; Installation of new wastewater pi... | 06/02/2022 | ||
| US97 at Wickup JCT 6/16/22 9am 1. Construct a shared use path between Burgess Road and 1st Street in La Pine. 2. Construct drainage... | 06/16/2022 | ||
| Whiskeytown Fuels Reduction 6/21/22 2pm The objective of the Whiskeytown Hazardous Fuels Project is to reduce the hazardous fuels in close p... | 06/21/2022 | ||
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.