Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
CBNB Water Board Project 3/17/22 2pm
Work consists of wall repair, casework replacement, Diebold |
03/07/2022 | 03/17/2022 | |
|
SSSD Phase 4 Sewer Line Rehab 3/15/22 2pm
Complete 27 lateral rehabilitations and 4,629 lineal feet of cured in place sewer pipe repairs. | 03/15/2022 | ||
|
Design Build Muni Pool Replace 3/7/22 2pm
This request for proposals is for a design-build contract intended to replace the existing pool r... |
03/07/2022 | ||
|
2022 Lane Co. Slurry Seal Project 3/15/22 10am
The approximate quantities are: 275,000 square yards of Type II Slurry Seal and all other work ca... |
03/15/2022 | ||
|
2022 Site Improvement Modoc HS 3/15/22 2pm
The work at Modoc High School consists of Surface preparation and 2 inch HMA overlays; performing... |
03/01/2022 | 03/15/2022 | |
|
Brophy Pump Station Abandonment 3/8/22 2:15 pm
The construction of 1,305 feet of 8 inch gravity sewer, 647 feet of 4 inch pressure sewer, 6 manh... |
03/02/2022 | 03/08/2022 | |
|
Centennial Overlay Aspen to Prescott 3/16/22 2pm
The Project consists of a pavement inlay; Americans with Disability Act (ADA) upgrades to existin... |
02/28/2022 | 03/16/2022 | |
|
Benton Airpark Runway Pavement 3/22/22 3pm
The project includes rehabilitation of the runway and taxiway connectors which will include remov... |
03/22/2022 | ||
|
Landfill & Wetlands Project Short Mountain Landfill 3/22/22 10am
For performing the earthworks, lining, and leachate collection and removal system for 8.49 ac | 03/22/2022 | ||
|
Baker Downtown Center Roof Asbestos 3/15/22 2pm
Asbestos abatement and demolition on the south Area F of the Baker Center Building in conjunction... |
03/03/2022 | 03/15/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.