Filter
| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Plumbing Service Reconnections 12/16/21 2pm
Installation of new water service pipelines between new water meter installations and existing ho... |
12/16/2021 | ||
|
Maslow Ductwork Replacement 12/22/21 2pm
HVAC ductwork replacement, exhaust fan installation & ducting. The contractor is responsible ... |
12/10/2021 | 12/22/2021 | |
|
Knight Library Exterior Restore Phase A 1/31/22 2pm
Roof replacement, exterior brick cleaning and tuckpointing, Concrete Cleaning, Sealants, Painting... |
12/14/2021 | 01/31/2022 | |
|
Edgewood & Spencer Butte Sidewalks 12/16/21 2pm
Replacement of approximately 768 linear feet of concrete sidewalk at Edgewood Elementary and Spen... |
12/08/2021 | 12/16/2021 | |
|
Weed Elementary Structural Steel 12/15/21 2pm
Structural Steel |
12/15/2021 | ||
|
Mohawk HS Voluntary Seismic 12/21/21 2pm
Briefly, the work consists of all architectural, structural, civil, and MEP work for Mohawk High ... |
12/10/2021 | 12/21/2021 | |
|
Metal Structures Over Playgrounds 12/22/21 2pm
The projects consist of supplying and assembly of three steel buildings. Two buildings at Brockwa... |
12/08/2021 | 12/22/2021 | |
|
Hollow Lane Storm Drain Project 1/6/22 3pm
Replace double corrugated metal storm drain pipes with a precast reinforced concrete box culvert ... |
01/06/2022 | ||
|
Resurface Basketball Court 1/11/22 2pm
Resurface and stripe the existing Enterprise Park Basketball Courts (approximately 11,500 S.F.) | 01/11/2022 | ||
|
Walk in Cooler JoLane Middle School 1/13/22 2pm
Refrigeration system and structure for a Commercial Walk-in Refrigerator. The new replacement uni... |
01/13/2022 | ||
| Title | Site Walk Through | Deadline |