| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
OR138E Wheel Rut Patching 6/14/22 3pm
Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified As... |
06/14/2022 | ||
|
OR38 Drainage Curbing Repair 6/14/22 2pm
Remove existing drainage curbing and construct new concrete drainage curbing located along OR38 a... |
06/14/2022 | ||
|
101 Drainage Curbing Repair 6/16/22 2pm
Remove existing drainage curbing and construct new concrete drainage curbing along US101, at vari... |
06/16/2022 | ||
|
Water System Analysis Oregon Caves 6/9/22 5pm
Conduct a chlorine contact time analysis on the water system at Oregon Caves National Monument &a... |
06/09/2022 | ||
|
Summit HS AV Project 6/16/22 2pm
Supplying and installing approx. 55 classrooms with AV equipment. |
06/08/2022 | 06/16/2022 | |
|
Bi-Directional Pavement Marker Project 6/21/22 2pm
Project includes Mobilization and demobilization, Traffic Control and Install Yellow Bi-Direction... |
06/21/2022 | ||
|
2022 Coos Co. Paving Project 6/21/22 2pm
Project includes, Mobilization and demobilization, Traffic Control, Install temporary flexible pa... |
06/21/2022 | ||
|
Karuk Tribe Tree Removal 6/9/22 5pm
1. Fall approximately twenty-seven (27) trees of varying sizes with stumps/roots attached |
06/09/2022 | ||
|
Cascade MS Replacement Rebid 7/26/22 2pm
Construction of a new middle school building, construction of a new sports field, renovation of a... |
07/26/2022 | ||
|
Camera Migration 6/30/22 2pm
1. The School District has 23 sites that need to have cameras removed and some reinstalled at oth... |
06/06/2022 | 06/30/2022 | |
| Title | Site Walk Through | Deadline |
Need Help?
Use the filters above to narrow down results by category, location, or keyword. Can't find what you're looking for? Contact us and we'll help you find the right opportunities.