| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Leachate Pond & Floating Cover Replace 12/16/20 10am Remove and dispose of existing floating cover system into onsite landfill; remove estimated 500,000 ... | 12/16/2020 | ||
| South Hills 4th Level Reservoir 11/12/20 2pm Construction of a new South Hills 4th Level Reservoir, a 0.46-million-gallon (MG) ground level welde... | 10/07/2020 | 11/12/2020 | |
| ZIRC Annex Abatement & Demolition 10/13/20 2pm Asbestos Abatement and demolition of a 20′ x 50′ metal building located on the North Sid... | 10/13/2020 | ||
| 36th Avenue Water Main Replacement 10/20/20 2pm Water main replacement on 36th Ave Crest Dr to Monroe St. in Eugene OR. | 10/20/2020 | ||
| Weekend Beer Company 10/13/20 2pm New construction of pre-engineered metal building with design/build MEP systems. Work also includes ... | 10/13/2020 | ||
| Huestis Hall Deferred Maintenance 10/16/20 2pm Preconstruction and Construction services for the Huestis Hall Deferred Maintenance Project encompas... | 10/06/2020 | 10/16/2020 | |
| Pruner Industrial Way Traffic Control Project 10/30/20 2pm The project scope includes two phases. Phase 1 consists of engineering design of the chosen traffic... | 10/30/2020 | ||
| ESB Project 2020 D7 North Douglas Curbing 10/13/20 3pm Removing existing curbing and constructing new concrete drainage curbing at various locations along ... | 10/13/2020 | ||
| Family Mart Shell N Medford 4/9/21 4pm Current construction of new Shell gas station and convenience store at 70 Rossanley in Medford. Roof... | 04/09/2021 | ||
| Electrical Vehicle Supply Equipment 10/20/20 2pm Install and electrically connect EVSE infrastructure to include wiring devices and all required asso... | 10/08/2020 | 10/20/2020 | |
| Title | Site Walk Through | Deadline |