| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Thurston Rd Ph 6 Restoration 9/2/20 2pm A.Saw cut and remove additional asphalt, cold mix asphalt, CLSMat crossings, and/oraggregate materia... | 08/31/2020 | 09/02/2020 | |
| Pilot Butte Canal Staking Services 9/3/20 2:30pm Define the design survey base used the Engineer in layout of the pipe system, and to set forth the r... | 09/03/2020 | ||
| Pilot Butte Canal Group 1 Precast Concrete 9/3/20 2pm Precast Fittings. Specs noted in section V of ITB | 09/03/2020 | ||
| Technology Services Office Remodel 9/24/20 2pm The Project consists of the general construction services for the remodel of approximately 14,900 sq... | 09/10/2020 | 09/24/2020 | |
| Klamath Crimson Rose Classroom 9/30/20 2pm This project consists of building out and existing unfinished space inside the Klamath County Juveni... | 09/11/2020 | 09/30/2020 | |
| Erickson Dental Remodel & Addition 9/18/20 2pm 2,355 sf remodel and 908 sf expansion of an existing single story, wood framed dental clinic. Scopes... | 09/18/2020 | ||
| CM/GC Madison School Renovation 9/21/20 2pm The project includes building an addition to the existing building, replacement of existing modular ... | 09/02/2020 | 09/21/2020 | |
| Reservoir Cleaning & Inspection 9/22/20 3pm This project includes cleaning, cleaning waste discharge, and inspection at twelve (12) of the City&... | 09/22/2020 | ||
| Key and Core Replacement 9/7/20 3:00pm Design, purchase and installation of cores and keys to provide a secured and tracked key system for ... | 09/07/2020 | ||
| OIT Athletics AV System Equipment 8/31/20 1pm Procure audio and visual equipment for the Oregon Tech Athletics Building at the Oregon Tech Klamath... | 08/31/2020 | ||
| Title | Site Walk Through | Deadline |