| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Vogel Shop & RV 9/15/20 4pm 24×38 shop with 12×28 RV covered area. Includes footings, slab, 2×6 construction trus... | 09/15/2020 | ||
| Army Building Demolition 9/22/20 1pm The Project consists of demolition of the existing Armory Building in preparation for a future const... | 09/09/2020 | 09/22/2020 | |
| Pilot Butte Canal Concrete, Bridge 9/17/20 2:30 pm The purpose of this section is to define the responsibilities for Cast-in-Place (CIP) Concrete. All ... | 09/03/2020 | 09/17/2020 | |
| Salt Creek Heights Neighborhood Park 9/22/20 3pm This project includes the construction of park facilities; including storm drain, sanitary sewer sys... | 09/22/2020 | ||
| Lane County Naval Storage Building 9/22/20 3pm Construction of a new pre-engineered metal storage facility approximately 4000 sq/ft, located at the... | 09/10/2020 | 09/22/2020 | |
| Chetco River Replace Fuel Tank 10/13/20 2pm Remove and replace fuel tank and associated components at Station Chetco River in Brookings | 09/09/2020 | 10/13/2020 | |
| EHRM Roseburg Training Site Prep 9/11/20 2pm Involves electrical and telecommunications work for the EHRM Training Site located at the VAMC in Ro... | 08/28/2020 | 09/11/2020 | |
| Water Replacement Project Schedule A & B 9/29/20 2pm Schedule A Project consists of installing approximately 2,050 LF of 10-inch water main, 4,975 LF of ... | 09/04/2020 | 09/29/2020 | |
| Cypress Avenue Restore & Enhance 9/22/20 3pm This project includes the installation of 2 bridges on the floodplain of the Sacramento River, south... | 09/10/2020 | 09/22/2020 | |
| Fishing Pier Construction 9/16/20 2pm Construction of a concrete, steel, and FRP fishing pier on breakwater of the Coquille River, near th... | 09/04/2020 | 09/16/2020 | |
| Title | Site Walk Through | Deadline |