| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Cleveland & Emerald Watermain Replace 10/29/20 2pm Construction of 8 inch potable waterline, construction of potable water services and fire hydrant co... | 10/13/2020 | 10/29/2020 | |
| Glenwood Substation Earthwork & Foundations 10/27/20 2pm Prepare a plot of land for the construction of an electrical substation. The site prep work you are ... | 10/13/2020 | 10/27/2020 | |
| Goodpasture Bridge Roof Replacement 10/16/20 1pm 1. Work closely and collaboratively with Lane County engineering staff to develop plans that add str... | 10/16/2020 | ||
| Utility Water System Master Planning 10/26/20 3pm Coos Bay-North Bend Water Board (Water Board) is requesting qualifications for Professional Enginee... | 10/26/2020 | ||
| Avion Water Office Building 10/14/20 2pm New construction of a 6,702 square foot office building located at the NW corner of China Hat Road a... | 10/07/2020 | 10/14/2020 | |
| Victorie Way & Grange St. Storm Drain 10/17/20 3pm The project includes replacement of approximately 200 linear feet of 24” reinforced concrete pipe an... | 10/17/2020 | ||
| Short Mountain Flare Supply 10/9/20 5pm Provide a Landfill Methane Gas Candlestock flare (2000 scfm CSF), Blower Skid (2000 scfm centrifugal... | 10/09/2020 | ||
| US101 Munsel to OR126 10/22/20 9am Grading, paving, signing & curb ramps | 10/22/2020 | ||
| US97 Nels Anderson Romaine Village 10/22/20 9am Grading, drainage, structures, paving, curb ramps, signing & signals | 10/22/2020 | ||
| Metal Roof Installation 10/7/20 4pm Installation of insulation and metal roof with a 4/12 pitch on a 40x60x24 metal building. All mater... | 10/07/2020 | ||