| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Half Moon Bay Shop 11/4/20 2pm Construction of a shop and road, sewer work, electric work, and earthwork | 10/13/2020 | 11/04/2020 | |
| Springhill Suites Marriott 10/28/20 2pm Ground up wood framed 4 story hotel that is 79,712 SF in Navigators Landing. 149 room hotel on 2.52 ... | 10/28/2020 | ||
| GP Waterline Crossing I-5 10/22/20 3pm Installation of approximately 3,140 Lineal Feet of 12″ Ductile Iron Water Main Pipe of which 1... | 10/15/2020 | 10/22/2020 | |
| Reinhart Park Pergola Repairs 10/29/20 3pm REPLACEMENT OF ALL PERGOLA WOOD COMPONENTS WITH DECAY RESISTANT WOOD AND PRIME/PAINT NEW WOOD TO MAT... | 10/15/2020 | 10/22/2020 | |
| Jewett Elementary New Building 10/22/20 2pm Construction of a new 11,442 sf gymnasium and makerspace building. Main structure consists of two pr... | 10/22/2020 | ||
| Remove & Replace Asphalt WWTP 10/19/20 12pm Grind and remove existing asphalt, place new asphalt, and raise valve boxes and lids to grade at the... | 10/19/2020 | ||
| Corvallis HS Supply Metal Building Systems 10/15/20 2pm Supply of the Metal Building Systems | 10/15/2020 | ||
| Solid Waste Welding Building Drainage 10/15/20 3pm Replace asphalt concrete around the southwest corner of the Welding Building with concrete and aspha... | 10/15/2020 | ||
| Annual Campus Roof Repair & Replace 10/27/20 2pm Oregon State University (“OSU” and/or “Owner”) is conducting a competitive ONE OR TWOSTEP Comprehens... | 10/12/2020 | 10/27/2020 | |
| Asphalt Pavement Repairs 10/20/20 2pm Asphalt Pavement Repairs on eight street sections with approximately 7,000 Square Yards of Asphalt P... | 10/20/2020 | ||
| Title | Site Walk Through | Deadline |