| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Elkton Elementary Phase II 4/1/21 3pm Construction of a 17,000 + sq ft. gym/classroom, including site preparation. The new building is a p... | 04/01/2021 | ||
| GP Oil Stop & Car Wash 3/17/21 2pm Ground up construction of car wash and oil stop. Specs are included with the plans. | 03/17/2021 | ||
| Chemult Maintenance Shop Asbestos 3/24/21 11am Project Scope: To provide all labor, equipment, materials, and permits/engineering to Remove or abat... | 03/24/2021 | ||
| Windsor Cir. 36th & 38th Pavement 3/19/21 2pm Roadway reconstruction on Windsor Circle with stormwater and wastewater repairs. Pavement Overlay on... | 03/19/2021 | ||
| Half Moon Bay Shop Flatwork 3/30/21 2pm Clear and grub work area; install and maintain temporary erosion control; perform earthwork; prepare... | 03/12/2021 | 03/30/2021 | |
| Tank 1 & Roseburg Water System Project 5/4/21 2pm The Project consists of construction of approximately 8,300 feet of 12-inch water main, one welded s... | 03/15/2021 | 05/04/2021 | |
| Replace BMF Heaters at USCG Coos Bay 3/30/21 5pm Replace existing hydronic boiler with new energy efficient hydronic boiler in Boat Maintenance Facil... | 03/15/2021 | 03/30/2021 | |
| Stewart Parkway End Panel Repair 3/30/21 2pm Construction of replacement of the bridge end panels of the Stewart Parkway Bridge. | 03/25/2021 | ||
| Madison Elementary School Renovation 4/1/21 4pm The Project consists of major renovations to the existing Madison Elementary School Building. The ex... | 03/12/2021 | 04/01/2021 | |
| 2021 Pavement Maintenance Sisters 3/17/21 2pm Improvements generally include grind & inlay of asphalt pavement on portions of Main Avenue as w... | 03/17/2021 | ||
| Title | Site Walk Through | Deadline |