| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Humboldt Co. Jail ADA Improvements 10/6/20 2pm
Work will consist of improvements to the second, third, and fifth floors to achieve compliance wi... |
09/29/2020 | 10/06/2020 | |
|
Cooling Tower Repairs 10/21/20 3pm
Address and repair parts of the cooling tower. Replace the existing fire protection system with a... |
09/29/2020 | 10/21/2020 | |
|
Install Sliding Glass Doors City Hall 10/7/20 2pm
The Contractor shall, at his own expense, furnish all labor, materials, tools, transportation, eq... |
09/23/2020 | 10/07/2020 | |
|
Cher-Ae-Heights Casino Hotel 10/9/20 5pm
A new 77,100 square foot 100 room Hyatt Place Hotel |
10/09/2020 | ||
|
Merlin Landfill Water Quality Swale 10/1/20 3pm
Project includes: traffic control, erosion & sediment control, construction staking, demoliti... |
09/24/2020 | 10/01/2020 | |
|
RHMA-G HMA & Concrete Barrier 10/22/20 2pm
In Humboldt County In And Near Eureka From 0.8 Mile South Of Tompkins Hill Road Overhead To 0.4 M... |
10/22/2020 | ||
|
Klamath Boat Marina to Lakeshore 10/8/20 2pm
This project is to widen a six mile stretch of roadway along OR 140 to accommodate current and fu... |
10/08/2020 | ||
|
Street Striping Project 9/29/20 2pm
Repainting approximately: Approx. 171,500 total lf of yellow center line (Includes 4″ singl... |
09/29/2020 | ||
|
Flooring at City Hall Common Areas 10/1/20 3pm
Contractor shall furnish equipment, material, and labor for the installation of commercial grade ... |
10/01/2020 | ||
|
Churchill High School Wood Shop Remodel 9/22/20 2pm
Renovation of an existing large classroom into a Wood Shop. The Project will be a single design a... |
09/22/2020 | ||
| Title | Site Walk Through | Deadline |