| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| COIC RFQ for A & E Services 3/19/21 4pm This project will be to design & engineer permanent bus stop pads, signage, benches, shelters &a... | 03/19/2021 | ||
| Lava River Cave Trail Construction 3/26/21 4pm The Lava River Cave Trail project involves removal and replacement of the existing perimeter fence s... | 03/26/2021 | ||
| High Banks & Thurston Rd. 3/18/21 2pm Mill and pave High Banks Rd. (Hwy 126 to 58th Street), 58th Street (High Banks Rd. to roundabout), a... | 03/08/2021 | 03/18/2021 | |
| CM/GC Knight Campus 4th Floor West Surgery 3/17/21 2pm Pre-construction and construction services related to the Knight Campus Fourth Floor West Surgery Su... | 03/05/2021 | 03/17/2021 | |
| Lower Rogue Estuary Enhancements 3/29/21 3pm Access the restoration (Krambeal Creek Sough and Indian Creek Off-Channel) sites with equipment, wor... | 03/10/2021 | 03/29/2021 | |
| Dollar General Roseburg 3/19/21 5pm Ground up construction of Dollar General in Tenmile, Or. | 03/19/2021 | ||
| Rose Court Apartments 3/16/21 2pm Project includes: cast in place concrete, cast underlayment, Metal fabrication, stairs, & pipe &... | 03/16/2021 | ||
| Jewett Elementary Remodel 3/18/21 2pm Project includes, selective demolition, concrete, masonry, structural steel, metal fabrication, roug... | 03/03/2021 | 03/18/2021 | |
| Sams Valley Elementary Remodel 3/11/21 5pm Trades include demolition, cast in place concrete, metal fabrications, rough carpentry, glued-lamina... | 03/03/2021 | 03/11/2021 | |
| Electrical Services Lane Co. Waste 3/17/21 5pm The work of the RFP will be for Electrical Services for Lane County Public Works. Lane County Waste ... | 03/17/2021 | ||
| Title | Site Walk Through | Deadline |