| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Harrisburg Middle School 3/30/21 2pm Scope of work includes abatement, selective demo, concrete, masonry, structural steel & sheet me... | 03/12/2021 | 03/30/2021 | |
| Member Directory Member Directory | - | ||
| Highland-Glacier Sewer Repair 4/6/21 2pm The City or Redmond has three locations on Highland Ave (HWY 126 East Bound) and two locations on SW... | 04/06/2021 | ||
| North Canal Sewer Main Replace 3/30/21 2pm The City of Redmond has 480 feet of 8” asbestos concrete sewer main that needs to be removed and rep... | 03/30/2021 | ||
| WTP Site Cleanup 4/15/21 3pm The City of Grants Pass will be developing approximately 7.7 acres of industrial property located at... | 03/19/2021 | 04/15/2021 | |
| Washington St. Sewer Replace 3/25/21 2pm Construction of an 8 inch sewer main, manholes, sanitary sewer laterals and asphalt concrete paving. | 03/16/2021 | 03/25/2021 | |
| Mae Richardson Upgrades 3/18/21 2pm Remodel of 44,000+ Elementary School including: Site upgrades (expanding parking lot, install landsc... | 03/18/2021 | ||
| A & E Admin/Ops Building Upgrades 4/14/21 3pm The purpose of this document is to provide interested parties with information to enable them to pre... | 04/14/2021 | ||
| Roadway Striping Rumble Strip Install 3/30/21 10am The approximate quantities are: rumble strips (Continuous Rumble Strips), longitudinal pavement mark... | 03/30/2021 | ||
| Oil Rock, Sanding Rock Various Sites 3/23/21 10am The approximate quantities are: 1/4” – #10 sanding rock in stockpile, 2,700 Tons; 3/8” –... | 03/23/2021 | ||
| Title | Site Walk Through | Deadline |