| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Vessel Disposal Project 4/9/21 5pm The project involves removing each vessel from its current location, dismantling of the vessel in an... | 04/09/2021 | ||
| City Hall HVAC Replacement 4/1/21 2:30pm • Trane 7.5 Ton Packaged Unit • 7.5 Ton Rooftop Adapter Curb • Dry Bulb Economizer • Smoke Detector ... | 04/01/2021 | ||
| US101 MP215 Culvert Replacement 4/7/21 3pm Culvert removal & replacement. | 04/07/2021 | ||
| MSD Update/Replace Pneumatic Components 4/20/21 2pm Updating/replacing remaining pneumatic actuators and controls to dual duct boxes with digital compon... | 03/31/2021 | 04/20/2021 | |
| Slurry Seal Various Maintenance Zones 4/7/21 2pm The Class of Work of this Project is Asphalt Concrete Paving and Oiling. The value for this Contrac... | - | ||
| Oak Valley Sewer Reconstruction 4/13/21 2:15pm Construction of approximately 3,100 feet of 8 inch gravity sewer, along with associated manholes and... | 04/06/2021 | 04/13/2021 | |
| Storm Damage Shively Road 4/27/21 2pm The work to be done consists of traffic control systems, rock buttresses, culvert replacement, reinf... | 04/27/2021 | ||
| Storm Damage Repair Mattole Rd 36.06, 36.16 4/27/21 2pm The work to be done consists of consists of traffic control systems, clearing and rubbing, removing,... | 04/27/2021 | ||
| Hamilton Walton Transformation Project 4/15/21 2pm Fortis Construction is seeking proposals for the University of Oregon (UO) Hamilton Walton Residence... | 03/31/2021 | 04/15/2021 | |
| A & E Karuk Tribe Medical Clinic 4/6/21 5pm The Contracted Design Firm will work, with Tribal employees’ input, to submit 100% completed plans t... | 04/06/2021 | ||
| Title | Site Walk Through | Deadline |