| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Deadfront Padmounted Switchgears 4/6/21 2pm Deadfront Padmounted Switchgear 15 KV. | 03/23/2021 | ||
| Padmounted Transformers 4/6/21 2pm Single phase and three phase padmounted transformers for use in EWEB’s distribution system. | 04/06/2021 | ||
| Florence Center Seismic & Maint. 3/31/21 2pm Building systems analysis, seismic stabilization, deferred maintenance renovations, along with the i... | 03/31/2021 | ||
| Chetco Comm. Library Renovations 4/6/21 2pm Interior renovations to the main library area including the lobby in the Chetco Community Public Lib... | 03/23/2021 | 04/06/2021 | |
| Hemlock St. Improve Oak to Alder 3/31/21 2pm Construct approximately 390 lineal feet of new curb and gutter along the north side of Hemlock Stree... | 03/31/2021 | ||
| 42nd Street Overlay 3/25/21 2pm Grind and overlay existing asphalt roadway, construct ADA ramps, sidewalks, driveways, signage, stri... | 03/15/2021 | 03/25/2021 | |
| WWTP #1 Headworks Screen & Compactor 4/6/21 2pm Replace the ¾-inch, single-rake screen, compactor, and associated package controls at the Coos Bay W... | 03/19/2021 | 04/06/2021 | |
| Rickard Rd. Groff to US20 3/31/21 2pm • Install and maintain temporary traffic control. • Perform earthwork. • Construct aggregate base. •... | 03/31/2021 | ||
| Sewer Maintenance Eureka Rebid 5/11/21 2pm The Project is located in various locations throughout the City of Eureka, and is described as follo... | 04/27/2021 | 05/11/2021 | |
| Prineville Reservoir State Park 4/6/21 2pm Establish a Contract for Paving Improvements (including restoration of roadway and parking lots, col... | 04/06/2021 | ||
| Title | Site Walk Through | Deadline |