| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Rainbow Lane Improvements 3/25/21 2pm Pave Rainbow Lane from Jacobson Way through to Stanley Lane (approx linear 818 ft) install 120 linea... | 03/25/2021 | ||
| Jacoby Creek Underground Waterline 3/25/21 1pm New fire domestic waterlines from Old Arcata Road to the new fire hydrant at the southeast cormerof ... | 03/25/2021 | ||
| Gilkey Hall Design Services 3/23/21 2pm Schematic Design, Design Development, Construction Documents, Permitting, Bidding, Construction Admi... | 03/15/2021 | 03/23/2021 | |
| Newport Corridor Improvements Plumbing 3/25/21 2pm Plumbing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-segment, proje... | 03/25/2021 | ||
| Newport Corridor Material Testing 3/25/21 2pm Material Testing sub-bids for the Newport Corridor Improvements Project , a multi-year, multi-segmen... | 03/25/2021 | ||
| Canal Commons II 3/29/21 2pm Phase 2 includes, but is not limited to: concrete framework, reinforcement, cast in place concrete, ... | 03/29/2021 | ||
| Beulah Park Renovation 3/31/21 2pm Construction of approximately 3420 sq. ft. of sidewalk, ADA parking stall, and approximately 300 lin... | 03/31/2021 | ||
| Coos Bay North Jetty Repair 3/23/21 10am Includes toe, side slope, and crest repair construction above -18 feet NAVD88 elevation along 2,000 ... | 03/23/2021 | ||
| Urban Area ADA Ramp Project 4/1/21 10am Removing and replacing existing sidewalk ramps by reconstructing approximately 2740 linear feet of c... | 04/01/2021 | ||
| BLM Loon Lake Storm & Water Tank 3/26/21 12pm Remove existing Restroom A and install Government furnished CXT vault rest rooms. Includes: tree rem... | 03/16/2021 | 03/26/2021 | |
| Title | Site Walk Through | Deadline |