Hours Monday-Friday 8am-4pm
Open to the public

Search

Filter

By Bid Date

Enter the FROM Bid Date to filter.
Enter the TO Bid Date to filter.

By City

Select City Please*

By CSI Division


Filter to show only active postings.
Title Site Walk Through Deadline
Virginia, Colorado Stripe & Pave 4/14/21 2pm Removal and replacement of 577 feet of 24” storm drain, prepare and pave 1529 tons of Level 2 HMAC, ... 04/06/2021 04/13/2021
Water Tank Clean & Inspect 4/5/21 2:30pm The project has been revised to only include inspection and cleaning of the 1.6 MG tank and 200,000 ... 04/05/2021
E 19th Ave & Fairmont Paving 4/20/21 2pm The scope of work for this contract includes: Construction of Concrete Walk, Curb and Gutter, Asphal... 04/20/2021
I-5 Northbround Fence MP 11 & 14 4/8/21 3pm Replacement of 6900′ +/- of existing fence with new Type 2 Field Fence located on Interstate 5... 04/08/2021
Caldwell Park Skatepark Addition 4/27/21 3pm This project includes an approximately 17,155 square foot, poured-in-place, concrete skatepark, a 2,... 04/27/2021
Water Improvements Eureka 4/15/21 2pm This project consists, in general, of: Installation of temporary water main and service, removal of ... 03/23/2021 04/15/2021
Avion Water Company 4/15/21 2pm New construction of a 6,702 square foot office building located at the NW corner of China Hat Road a... 04/15/2021
Asphaltic Mix Patching Materials 4/13/21 10am To establish unit prices for Lane County’s Asphaltic Mix Patching Material needs during the period o... 04/13/2021
Liquid Asphalt Materials 4/13/21 10am To establish unit prices for Lane County’s liquid asphalt material, delivery, CRC distributor and op... 04/13/2021
Rock Materials Annual Price Agreement 4/13/21 10am To establish unit prices for Lane County’s requirements for Rock Material needs during the period of... 04/13/2021
Title Site Walk Through Deadline