| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Virginia, Colorado Stripe & Pave 4/14/21 2pm Removal and replacement of 577 feet of 24” storm drain, prepare and pave 1529 tons of Level 2 HMAC, ... | 04/06/2021 | 04/13/2021 | |
| Water Tank Clean & Inspect 4/5/21 2:30pm The project has been revised to only include inspection and cleaning of the 1.6 MG tank and 200,000 ... | 04/05/2021 | ||
| E 19th Ave & Fairmont Paving 4/20/21 2pm The scope of work for this contract includes: Construction of Concrete Walk, Curb and Gutter, Asphal... | 04/20/2021 | ||
| I-5 Northbround Fence MP 11 & 14 4/8/21 3pm Replacement of 6900′ +/- of existing fence with new Type 2 Field Fence located on Interstate 5... | 04/08/2021 | ||
| Caldwell Park Skatepark Addition 4/27/21 3pm This project includes an approximately 17,155 square foot, poured-in-place, concrete skatepark, a 2,... | 04/27/2021 | ||
| Water Improvements Eureka 4/15/21 2pm This project consists, in general, of: Installation of temporary water main and service, removal of ... | 03/23/2021 | 04/15/2021 | |
| Avion Water Company 4/15/21 2pm New construction of a 6,702 square foot office building located at the NW corner of China Hat Road a... | 04/15/2021 | ||
| Asphaltic Mix Patching Materials 4/13/21 10am To establish unit prices for Lane County’s Asphaltic Mix Patching Material needs during the period o... | 04/13/2021 | ||
| Liquid Asphalt Materials 4/13/21 10am To establish unit prices for Lane County’s liquid asphalt material, delivery, CRC distributor and op... | 04/13/2021 | ||
| Rock Materials Annual Price Agreement 4/13/21 10am To establish unit prices for Lane County’s requirements for Rock Material needs during the period of... | 04/13/2021 | ||
| Title | Site Walk Through | Deadline |