| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| OR138 Wheel Rut Patching 4/13/21 2pm Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified Aspha... | 04/13/2021 | ||
| OR126 Cline Falls Bridge Paving 4/13/21 2pm Establish a Contract for removing the existing asphalt and membrane from the existing bridge deck an... | 04/13/2021 | ||
| Elmira-Veneta Multi-Use Paths 4/29/21 4pm This project is to provide preliminary engineering and environmental studies needed to obtain NEPA a... | 04/29/2021 | ||
| Water Storage Improvement Project 5/14/21 3pm The Project contemplated consists of the following major components: • Sitework including tree remov... | 04/14/2021 | 05/14/2021 | |
| Duff WTP Relocated Entrance 4/20/21 2pm This work consists of, but is not limited to: asphalt cutting and grinding, excavation and placement... | 04/06/2021 | 04/20/2021 | |
| Fire Monitoring for Power Plant 4/20/21 2pm The successful contractor will provide a bill of materials with part numbers, which the City of Redd... | 04/08/2021 | 04/20/2021 | |
| Cross Street Water Main Replace 4/20/21 2pm Water main installation on Cross Street between N. Garfield Street and the end of Foch Street in Eug... | 04/20/2021 | ||
| Region 3 Geotechnical Drilling Rebid 5/12/21 3pm The Oregon Department of Transportation is seeking one qualified Contractor to provide Geotechnical ... | 04/13/2021 | ||
| Thurston Hills Trail Phase II 4/26/21 2pm The work consists of construction of approximately 4.21 miles of new multi-use trail. Of the 4.29 mi... | 04/12/2021 | 04/26/2021 | |
| Tumalo-Broadway Water Line Replace 4/28/21 2:00pm The scope of the work includes, but is not limited to, trenching & installation of approximately... | 04/14/2021 | 04/28/2021 | |
| Title | Site Walk Through | Deadline |