| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Harrison & Harvard Storm Drain 2/23/21 2pm
The work contemplated consists of installing approximately 60 lineal feet of 8-inch Ductile Iron ... |
02/23/2021 | ||
|
MST-2110 Slurry Seal 2021 2/16/21 2pm
This project includes all labor, equipment, and materials necessary to construct the following: a... |
02/16/2021 | ||
|
U of O Hamilton Walton Project 2/17/21 4pm
02/03/2021 |
02/17/2021 | ||
|
A & E Services Bethel SD 3/12/21 4pm
The projects will include, but are not limited to, the construction of a replacement middle schoo... |
02/04/2021 | 03/12/2021 | |
|
Wireless Equipment Upgrade 2/25/21 4pm
Provide products and/or services for the Wireless Equipment Upgrade project (2021). The District ... |
02/25/2021 | ||
|
Network Equipment Upgrade 2/25/21 4pm
Provide products and/or services for the Network Equipment Upgrade project (2021). The District s... |
02/25/2021 | ||
|
Riverfront Watermain ext. Phase II 2/17/21 2pm
Extension of a 42″ water main located on the University of Oregon’s riverfront proper... |
02/17/2021 | ||
|
District 7 Sutherlin MIM Paving 2/16/21 3pm
Complete Cold Plane Pavement Removal of asphalt concrete surface, furnish and place Emulsified As... |
02/16/2021 | ||
|
Tree & Veg Clearing OR238 MP32-33 2/11/21 3pm
Furnish material, equipment, and labor to fall trees, trim tree canopy, remove vegetation, chip m... |
02/11/2021 | ||
|
Stormwater Facility & Taxiway Removal 3/2/21 2pm
Demolition of the existing Taxiway B3 and the constructionof two separate stormwater facilities: ... |
02/11/2021 | 03/02/2021 | |