| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Structural Add Ward Rhoden Stadium 7/15/21 2pm Upgrades to stadium bleacher seating. | 06/24/2021 | 07/15/2021 | |
| Oregon War Heroes Memorial Landscape 8/5/21 2pm This project consists of landscaping, irrigation, and electrical lighting installation. This is a Ci... | 08/05/2021 | ||
| The Village School HVAC Gym & Office 6/28/21 6pm The kitchen and cafeteria currently are connected to a legacy steam heat gas-fired system. The goal ... | 06/28/2021 | ||
| The Village School HVAC Kitchen & Cafeteria 6/28/21 6pm The kitchen and cafeteria currently are connected to a legacy steam heat gas-fired system. The goal ... | 06/28/2021 | ||
| The Ewing Building 7/22/21 2pm The project is the new construction of a 7,524 SF pre-engineered metal building (PEMB) structure wit... | 07/22/2021 | ||
| Soil Stabilization Mercer Lake Rd. 6/29/21 1pm The approximate length of roadway to have the adjacent slopes stabilized by preapproved methods of s... | 06/29/2021 | ||
| Shasta Middle School Classroom Reno 6/29/21 3pm 2,800 SF Tenant Improvement (TI) of the Shasta Middle School Life Skills Classroom, including interi... | 06/18/2021 | 06/29/2021 | |
| Tulelake Parking Lot Gravel 6/25/21 5pm Supply and Deliver 1,400 tons of ¾ inch minus commercial gravel to the Lower Klamath Maintenance Sho... | 06/25/2021 | ||
| South Gate Bridge Project 7/22/21 1pm Build and install a 28 foot long by 16 foot wide concrete bridge with precast, pre-stressed voided c... | 07/22/2021 | ||
| McDonald’s Klamath Falls 6/21/21 12pm Sitework, paving, seal coating, striping, landscape/irrigation, interior/exterior demolition, concre... | 06/21/2021 | ||
| Title | Site Walk Through | Deadline |