| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| COID Pilot Butte Small Diameter Pipe 7/1/21 2:00pm Piping currently open irrigations canals in multiple segments. This includes piping of the mainline ... | 07/01/2021 | ||
| COID Pilot Butte Canal Precast Concrete 7/1/21 2:00pm Piping currently open irrigations canals in multiple segments. This includes piping of the mainline ... | 07/01/2021 | ||
| E 40th Ave Storage Tank Tree Remove 6/10/21 2pm The project will require the removal and disposal of approximately 265 trees, installation of 1,700 ... | 06/02/2021 | 06/10/2021 | |
| Platt Ave Curb Gutter Paving 6/15/21 11am Curb and Gutter, Paving, Grading | 06/15/2021 | ||
| ERD Parcel 3BC MEP Design Build 6/14/21 2pm The project is four-story apartment building that is “C” shaped in plan with an area of approximatel... | 06/14/2021 | ||
| Southwest Airlines Offices 6/8/21 2:30pm Tenant improvements at ground and upper floors of the A Gates area and minor work at the baggage han... | 06/01/2021 | 06/08/2021 | |
| Wilson Corridor Improvement Project 6/23/21 3pm Modernizing Wilson Avenue from Douglas Street to 15th Street. The intersections of 9th Street and Wi... | 06/08/2021 | 06/23/2021 | |
| Local Road Safety Plan 6/21/21 5pm Development and preparation of a Local Roadway Safety Plan (LRSP). The purpose of the plan must addr... | 06/21/2021 | ||
| Ventura Circle Underground Conduit 6/9/21 3pm The City of Ashland (COA) is seeking bids for Underground Primary/Infrastructure as per the attached... | 06/02/2021 | 06/09/2021 | |
| Buster Butte Road Sub Soiling 6/9/21 2pm Restore skid roads and temporary roads to soil conditions that existed prior to logging activities. ... | 05/26/2021 | 06/09/2021 | |
| Title | Site Walk Through | Deadline |