| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Windsor Estates Speed Table 7/15/21 2pm Installation of four (4) HMA speed tables and associated striping and signage assemblies. All other ... | 07/15/2021 | ||
| Citywide Safety 3rd & Pinebrook 7/15/21 2pm Construction of accessible curb ramps, sidewalk, modular block wall, a raised concrete median safety... | 07/15/2021 | ||
| SE Anton Center 6/25/21 4pm Sub bids needed for excavation, slab prep, unterground utilities, stormwater detention system, site ... | 06/25/2021 | ||
| Burrill’s 7th St. Station 7/6/21 2pm Main structures consist of two pre-engineered metal buildings each 10,000 GSF of office, warehouse w... | 07/06/2021 | ||
| 2021 Main St. Stevens Road Driveways 6/16/21 10am Traffic control, concrete driveway, concrete removal, minor grading. | 06/16/2021 | ||
| Warehouse Add & Office Renovations 8/17/21 2pm The scope consists of site demolition, office space renovation, demolition of an existing warehouse ... | 06/15/2021 | 08/17/2021 | |
| Fence Removal & Replace 6/25/21 5pm Removal & disposal of wire fencing. Removal of vehicle access gate. Removal & disposal of tw... | 06/25/2021 | ||
| Green Springs Valve 7/14/21 10am Refurbishment of the powerplant guard valve and guard valve controls. | 07/14/2021 | ||
| Harris Hall HVAC Remodel 7/22/21 2pm The Project consists of the general construction services for the HVAC remodel of the Lane County Ha... | 07/22/2021 | ||
| River Rock Family Practice 6/29/21 2pm Construction of a single-story 6,110 sf wood framed medical office building with engineered wood tru... | 06/29/2021 | ||
| Title | Site Walk Through | Deadline |