| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| OIT Window & Door Replace 7/19/21 1pm The purpose of this RFQ is to hire a qualified Contractor to supply and install new window frames an... | 07/19/2021 | ||
| Seal Coat Project 6/29/21 2:30pm Traffic Control, Seal Coat | 06/29/2021 | ||
| Bridge Preventative Maintenance 7/20/21 2pm The work to be done on BPMP 5904(140) consists of traffic control, cleaning bridge expansion joints,... | 07/20/2021 | ||
| Structural Add Ward Rhoden Stadium 7/15/21 2pm Upgrades to stadium bleacher seating. | 06/24/2021 | 07/15/2021 | |
| Oregon War Heroes Memorial Landscape 8/5/21 2pm This project consists of landscaping, irrigation, and electrical lighting installation. This is a Ci... | 08/05/2021 | ||
| The Village School HVAC Gym & Office 6/28/21 6pm The kitchen and cafeteria currently are connected to a legacy steam heat gas-fired system. The goal ... | 06/28/2021 | ||
| The Village School HVAC Kitchen & Cafeteria 6/28/21 6pm The kitchen and cafeteria currently are connected to a legacy steam heat gas-fired system. The goal ... | 06/28/2021 | ||
| The Ewing Building 7/22/21 2pm The project is the new construction of a 7,524 SF pre-engineered metal building (PEMB) structure wit... | 07/22/2021 | ||
| Soil Stabilization Mercer Lake Rd. 6/29/21 1pm The approximate length of roadway to have the adjacent slopes stabilized by preapproved methods of s... | 06/29/2021 | ||
| Shasta Middle School Classroom Reno 6/29/21 3pm 2,800 SF Tenant Improvement (TI) of the Shasta Middle School Life Skills Classroom, including interi... | 06/18/2021 | 06/29/2021 | |
| Title | Site Walk Through | Deadline |