| Title | Site Walk Through | Deadline | |
|---|---|---|---|
|
Klamath Falls National Fish Hatchery **POSTPONED**
Site preparation and site demolition, excavation, embankment, backfill and grading, base aggregat... |
05/31/2021 | ||
|
Juniper Elementary Reroof Project 3/16/21 2pm
Removal of existing built-up roof system on this facility |
03/04/2021 | 03/16/2021 | |
|
Patrick Elementary 3/10/21 5pm
Elementary School Remodel. |
02/26/2021 | 03/10/2021 | |
|
Reser Stadium Specialty Graphics 3/16/21 2pm
Completing Reser Stadium will demolish and reconstruct the west side of the stadium for improved ... |
03/03/2021 | 03/16/2021 | |
|
U of O Generator Svc. Maintenance 3/5/21 5pm
Inspection and maintenance services for power generators in five campus buildings. The University... |
02/05/2021 | ||
|
CPSD Early Learning Center 3/18/21 5pm
Utilize the existing infrastructure located on site at 615 S 2nd Street for a new K-2 school. The... |
03/18/2021 | ||
|
Klamath Tribes Minor Street Improve 3/11/21 1:30pm
Removing and disposing of vegetation and debris along roadside ditches and shoulders, re-shaping ... |
03/11/2021 | ||
|
Eagle Point HS Seismic Rehab 3/12/21 4pm
Eagle Point School District solicits proposals for a construction firm interested in providing Co... |
03/12/2021 | ||
|
Public Works Building 15 Roofing 3/11/21 2pm
Replacement of existing metal roof panels on Building 15 with new metal roof panels and addition ... |
02/23/2021 | 03/11/2021 | |
|
Sam’s Valley & Patrick Elem Hazardous Removal 3/3/21 2pm
Asbestos removal throughout various locations of both schools. Work to be performed during... |
02/24/2021 | 03/03/2021 | |
| Title | Site Walk Through | Deadline |