| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Soil Stabilization Mercer Lake Rd. 6/29/21 1pm The approximate length of roadway to have the adjacent slopes stabilized by preapproved methods of s... | 06/29/2021 | ||
| Shasta Middle School Classroom Reno 6/29/21 3pm 2,800 SF Tenant Improvement (TI) of the Shasta Middle School Life Skills Classroom, including interi... | 06/18/2021 | 06/29/2021 | |
| Tulelake Parking Lot Gravel 6/25/21 5pm Supply and Deliver 1,400 tons of ¾ inch minus commercial gravel to the Lower Klamath Maintenance Sho... | 06/25/2021 | ||
| South Gate Bridge Project 7/22/21 1pm Build and install a 28 foot long by 16 foot wide concrete bridge with precast, pre-stressed voided c... | 07/22/2021 | ||
| McDonald’s Klamath Falls 6/21/21 12pm Sitework, paving, seal coating, striping, landscape/irrigation, interior/exterior demolition, concre... | 06/21/2021 | ||
| Windsor Estates Speed Table 7/15/21 2pm Installation of four (4) HMA speed tables and associated striping and signage assemblies. All other ... | 07/15/2021 | ||
| Citywide Safety 3rd & Pinebrook 7/15/21 2pm Construction of accessible curb ramps, sidewalk, modular block wall, a raised concrete median safety... | 07/15/2021 | ||
| SE Anton Center 6/25/21 4pm Sub bids needed for excavation, slab prep, unterground utilities, stormwater detention system, site ... | 06/25/2021 | ||
| Burrill’s 7th St. Station 7/6/21 2pm Main structures consist of two pre-engineered metal buildings each 10,000 GSF of office, warehouse w... | 07/06/2021 | ||
| 2021 Main St. Stevens Road Driveways 6/16/21 10am Traffic control, concrete driveway, concrete removal, minor grading. | 06/16/2021 | ||
| Title | Site Walk Through | Deadline |