| Paving of Old 99 Hwy South 7/14/21 8:30am Implement temporary traffic control, perform cold-plane pavement removal, construct asphalt concrete... | 07/14/2021 | ||
| Chadwick Lane Crosswalk 7/14/21 8:30am Remove and reconstruct ADA ramps, sidewalks, curb and gutter. Install rectangular rapid flashing bea... | 07/14/2021 | ||
| Iverson Crossing Culvert 7/22/21 3:30pm Excavation and embankment Construct and maintain diversion during construction Construction of 17’ x... | 07/22/2021 | ||
| 2021 Crack Seal 6/28/21 2:30pm Traffic control, crack seal | 06/28/2021 | ||
| McNabb Creek Helipond Repair 7/14/21 3:30pm Ditch Excavation Construct diversion during construction Construction of new flashboard riser ... | 07/14/2021 | ||
| Powers Ranger Station HVAC 7/2/21 4pm Provide all equipment, labor, materials, supplies and supervision to supply and install up to four n... | 07/02/2021 | ||
| Locust St. Sewer Relocate 7/15/21 2pm Re-location and construction of a 12-inch sanitary sewer pressure main crossing Whychus Creek, creek... | 07/15/2021 | ||
| Northpointe Park 7/15/21 2pm Construction of a new neighborhood Park, including right of way work, & all work required per pr... | 07/15/2021 | ||
| Backup Generators Oregon Caves 7/7/21 5pm Construction of three standby generators at mission critical buildings, including gas connections, t... | 07/07/2021 | ||
| OIT Window & Door Replace 7/19/21 1pm The purpose of this RFQ is to hire a qualified Contractor to supply and install new window frames an... | 07/19/2021 | ||