| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Gym Facility Remodel 8/6/21 4pm 5,824 square foot project converting the Karuk “Old Gym” into a community center, kitche... | 07/07/2021 | 08/06/2021 | |
| South Umpqua HS Covered Walkway 7/8/21 2pm Work on this project consists of the remodel and enclosure of an existing covered walkway on the sou... | 06/24/2021 | 07/08/2021 | |
| Foundation & Drainage Winston Middle School 7/8/21 2pm The Winston Dillard School District requests sealed Bids from qualified Bidders for the Foundation R... | 06/24/2021 | 07/08/2021 | |
| Alderpoint Rd. MP40 Storm Damage 7/27/21 2pm The work to be done consists of traffic control systems, reinforced roadways, reconstructed embankme... | 07/27/2021 | ||
| CM/GC Health Professions Building 7/16/21 2pm The selected CM/GC firm will provide construction management and general contracting services, start... | 07/07/2021 | 07/16/2021 | |
| HVAC Powell Butte Charter School 7/7/21 1pm Select a Design-Build contractor to develop projects that will improve the indoor air quality and HV... | 07/07/2021 | ||
| Head Start Facility Renovation 6/28/21 5pm Remove and dispose of all flooring, cabinets, and kitchen island. Install approximately 300 square f... | 06/28/2021 | ||
| Airport Road Improvements 7/8/21 5pm Road improvements along the north side of Airport Rd. Includes but not limited to; excavation, rock ... | 07/08/2021 | ||
| Ashland Library Renovation 7/27/21 2pm Project includes demolition, new carpet, ceiling tiles, new storage room walls and door, case work, ... | 07/09/2021 | 07/27/2021 | |
| North Bend HS Kitchen Upgrade 7/1/21 1pm Contract consists of the removal and replacement of the existing walk-in cooler/freezer and demo of ... | 07/01/2021 | ||
| Title | Site Walk Through | Deadline |