| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Jackson Co. Emulsified Asphalt 3/25/22 10am Furnishing and delivering emulsified asphalt products | 03/25/2022 | ||
| Jackson Co. Aggregate Supply 3/25/22 10:30am Supplying at least 18,000 tons of driving surfacing aggregate to various locations. | 03/25/2022 | ||
| CCTV Inspection City of Powers 3/23/22 2pm Furnishing all labor, equipment, materials and supervision for the CCTV inspection of approximately ... | 03/17/2022 | 03/23/2022 | |
| Cape Seal 2022 3/30/22 3pm This project includes applying a polymer modified rejuvenating chip seal and polymer modified rubber... | 03/30/2022 | ||
| Transition Center Work Shop Replace 3/29/22 2pm This turn-key project will replace the previous 20′ x 30′ work shop lost to Alameda Wild... | 03/10/2022 | 03/29/2022 | |
| Tulelake HS & ES Renovation 3/22/22 4pm Trades involved include but are not limited to: site concrete, concrete cutting, concrete, rough car... | 03/09/2022 | 03/22/2022 | |
| Les Schwab Springfield Remodel 3/29/22 4pm Asbestos abatement, selective building demolition, concrete removal, minor excavation & finish g... | 03/10/2022 | 03/29/2022 | |
| Interstate 5 MP28-27 Rebid 3/29/22 3pm Grind inlay pavement preservation and striping. | 03/29/2022 | ||
| Willamette River Pedestrian Bridge 3/16/22 2:30pm Bridge washing and cleaning; Concrete and crack sealer; Concrete repair; Grout replacement for lifti... | 03/16/2022 | ||
| Lake District Hospital Remodel 4/6/22 5pm Occupational Therapy Rehab and Activity Room Remodel | 04/06/2022 | ||
| Title | Site Walk Through | Deadline |