| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Hindle Pit Rock Crushing 3/31/22 2pm Furnish all equipment, mobilization, supplies, transportation, labor, supervision, and incidentals t... | 03/31/2022 | ||
| Ped Ramp Improve La Pine Maintenance Zone 3/30/22 2pm The Work will consists of, but not be limited to, the following: Install and maintain temporary tr... | 03/30/2022 | ||
| Huestis Hall Asbestos Abatement 4/5/22 2pm The Project includes asbestos abatement to accommodate a building-wide renovation project. Materials... | 03/15/2022 | 04/05/2022 | |
| Lakeshore Dr. @ Doney Cr. Bridge Repair 3/28/22 11am Repair Timber Bridge | 03/28/2022 | ||
| BAS System Medford Online Academy 3/31/22 2pm HVAC automated controls system. | 03/11/2022 | 03/31/2022 | |
| Community Garden Fence Replacement 3/22/22 2:30pm Removal and replacement of community garden fence enclosures with cedar-clad steel posts and wire me... | 03/10/2022 | 03/22/2022 | |
| ADA Improvements Lundy Elementary 3/29/22 1pm The approximate quantities are: general excavation, 500 cubic yards; contractor furnished borrow mat... | 03/29/2022 | ||
| Ashland Airport Taxiway Reconstruction & Rehab 3/29/22 11am Major work items include: Asphalt Concrete Pavement Removal – 12,500 SY Earthwork including Excavat... | 03/15/2022 | 03/29/2022 | |
| YUSD Jackson St. School HVAC Rebid 5/24/22 11am 1. Remove existing HVAC system at Classrooms, Student Restrooms, and Hallways Located in Wings #1-3.... | 05/24/2022 | ||
| Jackson Co. Hot Mixed Asphalt 3/25/22 10:15am Furnishing hot mixed asphalt concrete for two scheduled projects totaling 14,500 tons | 03/25/2022 | ||
| Title | Site Walk Through | Deadline |