| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Ashland Library HVAC Upgrade 4/7/22 2pm The objective of this project is to replace aged HVAC equipment at the Ashland branch Library. | 03/11/2022 | 04/07/2022 | |
| Boiler BEI Testing & Boiler Tuning 3/11/22 9am The Contractor shall conduct annual safety device testing to three boilersusing the most recent VHA ... | 03/11/2022 | ||
| Anderson HS Tank Recoating 3/23/22 2pm The project involves all preparation, removal and legal disposal of potential lead based paint, mino... | 03/17/2022 | 03/23/2022 | |
| North Bend Muni Pool Replace Phase II 3/16/22 5pm The anticipated scope of work for this project is as follows: A. Remove & Replace with new steel... | 03/16/2022 | ||
| Gilham & Various Stormwater Improvements 3/22/22 2pm Stormwater structure modifications and stormwater pipe installation; Driveway Replacement; Construct... | 03/22/2022 | ||
| Abbott Creek Restoration Project 3/22/22 2pm Use a ground-based cable puller, to pull over approximately 50 trees into Abbott Creek. | 03/10/2022 | 03/22/2022 | |
| BAS System at Maslow 3/29/22 2pm Furnish and install all materials and equipment pertaining to the installation of an HVAC automated ... | 03/09/2022 | 03/29/2022 | |
| Fire Detection at Carmen Powerhouse 4/7/22 2pm Provide and install fire detection systems at EWEB’s hydroelectric project at Carmen Smith in ... | 03/10/2022 | 04/07/2022 | |
| BBS Line Roads Crushed Rock Delivery 3/21/22 2pm Provide, and chain spread 1½ -0 rock on existing BBS Line Roads at a thickness of 4 to 6 inches. Thi... | 03/21/2022 | ||
| Cleveland St. SCA Improve HWY 62 to Sloan 3/30/22 2pm Major components of the project include: 500 CY General Excavation 100 CY Embankment Installation 82... | 03/15/2022 | 03/30/2022 | |
| Title | Site Walk Through | Deadline |