| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Douglas HS Lower Parking Lot 6/21/22 3pm Project includes site development , including excavation, concrete, paving, landscaping, and irrigat... | 05/06/2022 | 06/21/2022 | |
| Douglas HS Culinary Classroom Rebid 8/2/22 3pm Project includes demolishing existing kitchen, classroom remodel, and updating sanitary lines and gr... | 08/02/2022 | ||
| Douglas HS Auditorium Refresh 5/25/22 3pm Building construction and remodeling, including general construction and electrical work. | 05/06/2022 | 05/25/2022 | |
| Transpacific Pkwy Drainage Improve 6/8/22 2pm The Work consists of, but is not limited to; traffic control, asphalt saw-cutting, asphalt grinding,... | 05/17/2022 | 06/08/2022 | |
| Polk St. Water Main Replace 5/19/22 2pm The construction and installation of 4190 feet of 8-inch ductile iron water main in Polk Street from... | 05/19/2022 | ||
| Oakdale Middle School Furniture 5/25/22 2pm School and office furniture for our new middle school, currently under construction. The new school ... | 05/25/2022 | ||
| Paving Alfalfa Market to Johnson Ranch 5/18/22 2pm The Class of Work of this Project is Asphalt Concrete Paving and Oiling. The value for this Contract... | 05/18/2022 | ||
| Phoenix Civic Center Temp Facilities 5/12/22 2pm Includes the renovation of approximately 3,000 square feet of the existing Civic Building to create ... | 05/12/2022 | ||
| ADA Curb Ramp Improve Phase 2 5/24/22 2pm The work to be done consists of traffic control system, roadway excavation, hot mix asphalt for shar... | 05/24/2022 | ||
| Grider Creek Campground Repair 6/1/22 5pm The project consists of installing a 4-inch gravel cap comprised of aggregate surface course to 46N2... | 06/01/2022 | ||
| Title | Site Walk Through | Deadline |