| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| SCADA Upgrade Improvements 5/5/22 2pm Process monitoring, control, and historical tracking take place through the existing SCADA system. M... | 04/21/2022 | 05/05/2022 | |
| RFQ Engineering Muni Water System 5/19/22 4pm The City of Grants Pass desires to select an engineering firm to enter into a renewable five-year Ma... | 05/19/2022 | ||
| Everett & State Roadway Improvements 4/27/22 2pm Removal and reconstruction of curb, gutter, sidewalk, and asphalt pavement on Everett Avenue between... | 04/27/2022 | ||
| Sunset School Security Vestibule 5/5/22 2pm Construction of a new security vestibule inside the main lobby of Sunset School, as well as select r... | 04/19/2022 | 05/05/2022 | |
| Eagsa Monitoring Well 5/5/22 3pm The project includes drilling, logging, construction, development, and sampling of one triple-nested... | 05/05/2022 | ||
| Multi Modal Transportation Hub 4/28/22 3pm The City of Sisters seek proposals from qualified transportation consulting firms with experience i... | 04/28/2022 | ||
| Zogg Fire Road Resurfacing 4/21/22 11am The work, in general, consists of replacing existing culverts, removing existing pipe culvert headwa... | 04/21/2022 | ||
| Donor Bench & Levy Furniture Install 5/12/22 2:30pm Installation of park benches and levy furniture at sites throughout the Eugene Parks and Open Space ... | 05/12/2022 | ||
| Tom McCall ES/Elton Gregory MS Add 4/27/22 4pm Construction of a new 10,000 square foot addition in between Tom McCall Elementary School and Elton ... | 04/14/2022 | 04/27/2022 | |
| Cave Junction ADA Ramp Improve 4/28/22 2pm Construct ADA ramps, asphalt street repair and pavement striping at five (5) different sites through... | 04/19/2022 | 04/28/2022 | |
| Title | Site Walk Through | Deadline |