| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| UO Huestis Hall Deferred Maintenance #5 6/2/22 3pm Brick Restoration, Architectural Casework and Millwork, Metal Panels, Doors/Frames/Hardware, Framing... | 05/11/2022 | 06/02/2022 | |
| Lone Pine Elementary Track Replace 6/8/22 2pm Remove and replace the asphalt track at Lone Pine Elementary School. Furnish and install all materia... | 06/08/2022 | ||
| Dunes City Parkway Drive Roadway 5/31/22 2pm Construction of a raised vertical curve with reinforced retaining walls, removal and replacement of ... | 05/31/2022 | ||
| Buildings 1 & 5 Fall Protection 5/24/22 2pm The Project consists of fall protection systems, roof walkway systems, roof access ladders, and patc... | 05/10/2022 | 05/24/2022 | |
| RFP Hotel Development Eugene Airport 6/21/22 4pm The City of Eugene is requesting proposals from parties interested in developing a hotel on property... | 06/21/2022 | ||
| Crook County Justice Center 5/24/22 2pm The request for bids is for the Elevators, earthwork, foundations, and associated underground scopes... | 05/24/2022 | ||
| 2022 Street Rehab 6/7/22 2pm Rehabilitation of approximately 309,610 square feet of City Streets. Provide a traffic control plan ... | 05/24/2022 | 06/07/2022 | |
| Quick Turn Around Facility Eugene Airport 6/2/22 2:30pm Construction of a new 8,000 SF single story office and automobile carwash building, a new multi-lane... | 05/12/2022 | 06/02/2022 | |
| Eureka Way Buenaventura Blvd. Signal 6/9/22 3pm Modify signal poles and lighting at the northeast corner of Eureka Way and Buenaventura Boulevard in... | 06/09/2022 | ||
| Fire Dept #2 Parking Lot Improve Rebid 6/29/22 10am Paving of existing gravel parking lot, installation of a stormwater swale, sidewalk with retaining w... | 06/29/2022 | ||
| Title | Site Walk Through | Deadline |