| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| District 7 Curbing Repair 5/10/22 3pm ESB Project. Remove existing curbing and construct new concrete drainage curbing at various location... | 05/10/2022 | ||
| Skinner Butte Park Steps Repair 5/24/22 4pm Two concrete step repair projects at the top and bottom of an existing trail near the Skinner Butte ... | 05/09/2022 | 05/24/2022 | |
| Baker Park Parking Lot Reconstruction 5/12/22 3pm The project will consist of installing of approximately 5 lineal feet of 8″ sanitary sewer pip... | 05/05/2022 | 05/12/2022 | |
| OIT Moehl Stadium Remodel 5/24/22 1pm The project includes implementing a new metal wall panel system for the entire exterior and replacem... | 05/24/2022 | ||
| Quick Quack Anderson 5/19/22 11am New 3,500 SF Car Wash; Trades required but not limited to; Survey, SWPPP, final clean, earthwork, as... | 05/19/2022 | ||
| White City Lagoon & Wetland Improvements 5/10/22 2:15 pm The construction of (3) three, one acre wastewater lagoons, impermeable liners, associated pipes, dr... | 05/04/2022 | 05/10/2022 | |
| Brookings SD Covered Areas Slabs Sidewalks 5/11/22 4pm Multiple repairs involving concrete, slabs, roofing, painting, etc. | 05/03/2022 | 05/11/2022 | |
| Prineville Reservoir Piling Install ADA 5/25/22 3pm Furnish & install 6″ schedule 80 pin piles to line and grade at the locations shown in the... | 05/02/2022 | 05/25/2022 | |
| Switchgear for EWEB at International Paper 5/10/22 2pm Medium voltage vacuum interrupter switchgear equipment for its power plant at International Paper in... | 05/10/2022 | ||
| Scenic MS Parking Lot Improve 5/12/22 2pm S & B James is requesting subcontractor proposals for: Survey, demolition, erosion control, clea... | 05/12/2022 | ||
| Title | Site Walk Through | Deadline |