| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| US199 Clear Zone Improvements 4/14/22 3pm Improve the clear zone distance by removing identified trees located within the clear zone. The tree... | 04/14/2022 | ||
| I-5 Deck Seals 4/7/22 2pm This Work consists of furnishing and placing concrete and crack sealer on concrete Bridge decks, con... | 04/07/2022 | ||
| Monroe Park Restroom Renovation 5/3/22 2:01pm Project includes new wood roof trusses, metal roof panels and curb mounted skylights, stormwater dra... | 04/12/2022 | 05/03/2022 | |
| Ashland WTP Outfall Relocation 4/26/22 2pm The project consists of providing approximately 2000 linear feet of 30-inch and 36-inch gravity PVC ... | 04/05/2022 | 04/26/2022 | |
| Camas Ridge Community Elementary 4/26/22 2pm The Project consists of construction of a new approx. 74,500SF two-story Elementary School with a 3r... | 04/26/2022 | ||
| Chipotle North Medford 4/11/22 12pm Tenant interior & exterior alterations to an existing unoccupied building. | 04/11/2022 | ||
| E Cypress Ave. Storm Drain Replace 5/5/22 3pm Replace approximately 155 linear feet of deteriorating storm drain box culvert with a precast concre... | 05/05/2022 | ||
| Redding Power Plant Fire Monitor 4/21/22 3pm This work includes modifications of existing dry-pipe sprinkler systems, new nitrogen generator syst... | 04/13/2022 | 04/21/2022 | |
| Perscribed Burn Vernal Pool Mitigation 4/14/22 3:15pm Broadcast burn at the Oregon Department of Transportation’s vernal pool properties. The 98 acr... | 04/14/2022 | ||
| Kalapuya HS Classroom Add 5/3/22 2pm The project consists of the construction of a new classroom building addition to the existing high s... | 04/06/2022 | 05/03/2022 | |
| Title | Site Walk Through | Deadline |