| Title | Site Walk Through | Deadline | |
|---|---|---|---|
| Cascade Office Storm Drain Repairs 7/7/22 11am The project consists of the replacement of approximately 1,060 feet of existing storm drain, varying... | 07/07/2022 | ||
| CM/GC Heritage Renovation 7/11/22 2pm The University of Oregon is seeking proposals from qualified Construction Manager/General Contractor... | 06/23/2022 | 07/11/2022 | |
| Charnelton 4th Floor Remodel 7/12/22 2pm General construction services for the remodel of office spaces in the Lane County Charnelton Place B... | 06/23/2022 | 07/12/2022 | |
| Replace Brandy Creek Lift Station 7/18/22 5pm Demolishing an existing sanitary lift station and components and constructing a new sanitary lift st... | 06/30/2022 | 07/18/2022 | |
| Duff WTP Filters Underground Pipe 7/6/22 2pm The Medford Water Commission (MEDFORD WATER) is seeking a vendor to provide AIS Compliant Fabricated... | 06/21/2022 | 07/06/2022 | |
| Ramsey Grandview Ped Safety 6/30/22 3pm This Project will Consist of Installing Approximately 69 LF of 12” Stormdrain Pipe, 5 Concrete Inlet... | 06/23/2022 | 06/30/2022 | |
| Clear Creek WWTP Pyrolysis Phase 1 7/19/22 3pm • Installation of biodryers and pyrolysis units for biosolids treatment for solids reduction; • Inst... | 06/28/2022 | 07/19/2022 | |
| Media Ctr. Drain Repair/Retaining Wall 7/7/22 2pm Install foundation drains, replace steps, add new retaining walls and curbs, sidewalks and irrigati... | 06/22/2022 | 07/07/2022 | |
| Outdoor Eating Spaces Phase 2 7/7/22 2pm Supply and install Five (5) Outdoor Eating Spaces approximately 40’ x 60’ each, per MSD specificatio... | 06/22/2022 | 07/07/2022 | |
| 2022 Cape Seal Project 7/1/22 2pm The work consists of placing an asphalt rubber binder chip seal, microsurfacing, and pavement deline... | 07/01/2022 | ||
| Title | Site Walk Through | Deadline |